Laserfiche WebLink
APES, - FETAL Building <br />Preliminary Construction Statement <br />Sharp Associates <br />1 st floor- 13,372 sf <br />for Commercial <br />500 <br />Bunker Lake Blvd NW <br />Mezz- 2„944 sf <br />Buildings <br />Anoka, MN 55303 <br />TOTAL 16,3161 sf <br />Phone 763-425-2002 <br />DESCRIPTION <br />BY SUBCONTRA00R <br />PROJECT COSTS <br />INSURANCE <br />CONSTRUCTION <br />Allowance <br />$ <br />2,500.00 <br />PERMANENT <br />EXCAVATING <br />SITE PREPARATION <br />DEMOLITION <br />FILL <br />COMPACTION <br />EXCAVATION <br />Bu Subcontractor <br />$ <br />30,000.00 <br />BACK FILL <br />FINAL GRADING <br />CEMENT WORK <br />FOOTINGS <br />By Subcontractor <br />96,000.00 <br />MASONRY BLOCK <br />MASONRY BRICK <br />SLABS <br />SITE CONCRETE <br />CURB& GUTTER <br />BOARD OPENING <br />POLISH FLOOR <br />STRUCTURAL <br />JOIST & DECK <br />See Supply <br />ERECTION <br />By Subcontractor <br />'$ <br />120,000.00 <br />MISC. METALS <br />PRECAST <br />REINFORCING <br />SUPPLY <br />By Subcontractor <br />$ <br />156,000.00 <br />ROOFING <br />INSULATION <br />See Erection <br />MEMBRANE <br />METAL <br />See Supply <br />PLATEICANTYsuCKS <br />MATERIAL <br />LABOR <br />SEWER & WATER <br />SANITARY <br />WATER -For Fire Protection Allowance <br />$ <br />10,000,00 <br />STORM <br />Allowance <br />$ <br />2,500.00 <br />SEPTIC TANK <br />Allowance <br />$ <br />6,000.00 <br />WELL <br />Allowance <br />$ <br />9,000.00 <br />MECHANICAL <br />PLUMBING <br />By Subcontractor <br />$ <br />25,990.00 <br />HVAC Ventilation <br />By Subcontractor <br />$ <br />126,132.00 <br />Prepared by Monte Helget <br />12:39 PM <br />No <br />Land. $1,218,000.00 <br />813012016 <br />2 of 5 <br />$74.85 / sf <br />