My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3 EDSR 10-17-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
2014-2020
>
2016
>
10-17-2016
>
6.3 EDSR 10-17-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2016 3:59:06 PM
Creation date
10/14/2016 2:59:14 PM
Metadata
Fields
Template:
City Government
type
EDSR
date
10/17/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
in our effort to continue our company growth, Apex is proposiing the addition of the <br />following equipment; an INO automatic print, dry, and stacking production, line for the purpose <br />of increasing our print production capacity as well as the efficiency of our printing operations. <br />This line will also provide us the additional needed capacity for the introduction a new product <br />that we have developed which is more efficient process of manufacturing multi -color heat <br />transfers. The Adelco dryer is for increasing throughput of our existing printing presses, the <br />Uni-Kate screen coater is for improving product consistency by mechanizing our screen coating <br />process. This is not a labor saving device it is strictly for quality control. The new wash out <br />booth is in increase our capacity for processing and recliaiming screens. The maxipress shuttle <br />heat press is to increase our production capacity for custom printed fabrics for our custom <br />applique part of our business. <br />Apex's present facility is currently a leased space in Ramsey, MN consisting of 4,50O sq. <br />ft. of production space, 3,000 sq. ft. of office and 1,500 sq. ft. of storage. There is no room, to <br />expand within the building at our current location,. We have explored existing buildings but <br />have found that what is available has been either too small, too large or by the time we <br />remodel to accommodate our requirements are not a, cost effective alternative. This is why <br />we are pursuing the option of a new construction project. <br />We have considered many sites throughout the NW Metro, and have decided to locate <br />in Elk River due to the availability of a variety of incentives and funding options that are crucial <br />to support our continued growth, sustainabiility and success. <br />
The URL can be used to link to this page
Your browser does not support the video tag.