My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1. SR 10-17-2016
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2016
>
10-17-2016
>
7.1. SR 10-17-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2016 1:11:33 PM
Creation date
10/14/2016 1:08:44 PM
Metadata
Fields
Template:
City Government
type
SR
date
10/16/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPLICATION REVIEW WORKSHEET <br />TO BE COMPLETED BY CITY STAFF <br />1. The project meets the criteria set forth in Section IV of the Forgivable Loan Policy. <br />Check those which apply. Must meet first four to score 20 points. 0 points if any ofthe first four boxes are unchecked <br />✓Creates new jobs which meet the federal low to moderate income guidelines <br />11 teases tax base <br />he project can demonstrate that investment of public dollars induces private funds <br />The project provides higher wage levels to the community or will add value to current workforce skills. <br />Th project results in the sale and development of city owned property (additiona1100 pointsgiven) <br />✓Applicant has sufficient collateral (if box isn't checked loan won't be considered) <br />Subtotal Section 1(maximum 120points) 30 <br />2. Consideration of Capacity. Check those which apply. Must meet all four to score 20 points. 0 points if any boxes are <br />unchecked. <br />Applicant included a realistic implementation /project schedule <br />Applicant has the ability to administer and monitor project <br />Applicant has the ability to conform to city, state and federal requirements <br />Applicant has agreed to annual progress reports and submission of salary surveys for all new hires <br />Subtotal Section 2 (maximum 20points) 90 <br />3. Impact: a Points <br />Number of new jobs as a result of the project: ✓�* /�S <br />*Award five points perjob created up to 150 points <br />Ratio of loan funds to jobs created/retained <br />$15,000 or less/job 80 points <br />$15,001-$24,999/job 60 points <br />$25,000-$34,999/job 40 points � <br />$35,000 and over/job 20 points U CJ <br />Increase in the local real estate tax base -- <br />>$500,000 20 points <br />$250,000 to $500,000 15 points <br /><$250,000 10 points <br />Immediacy of Impact n <br />*20 points awarded ifproject will begin within 6 months C9 <br />Subtotal Section 3 (maximum 270points) C)55*minimum of60pomts must come from this section m order for project to be considered <br />Forgivable Loan Policy and Application P 0 V E O E 1 I t <br />Page 16 of 20 NATURE <br />TURF <br />
The URL can be used to link to this page
Your browser does not support the video tag.