Laserfiche WebLink
APEX - METAL Building <br />1 st floor- 13,372 sf <br />Mea- 2,944 sf <br />TOTAL 16,316 sf <br />INSURANCE <br />EXCAVATING <br />CEMENT WORK <br />STRUCTURAL <br />ROOFING <br />PLATEICANTIBUCKS <br />SEWER 8 WATER <br />MECHANICAL <br />12:39 PM <br />8/30/2016 <br />Preliminary Construction Statement <br />for Commercial <br />Buildings <br />Sharp Associates <br />500 Bunker Lake Blvd NW <br />Anoka, MN 55303 <br />Phone 763-425-2002 <br />DESCRIPTION <br />BY SUBCONTRACTOR <br />PROJECT COSTS <br />CONSTRUCTION <br />Allowance <br />$ <br />2,500.00 <br />PERMANENT <br />SITE PREPARATION <br />DEMOLITION <br />FILL <br />COMPACTION <br />EXCAVATION <br />Bu Subcontractor <br />$ <br />30,000.00 <br />BACK FILL <br />FINAL GRADING <br />FOOTINGS <br />By Subcontractor <br />$ <br />96,000.00 <br />MASONRYBLOCK <br />MASONRY BRICK <br />SLABS <br />SITE CONCRETE <br />CURB & GUTTER <br />BOARD OPENING <br />POLISH FLOOR <br />JOIST & DECK <br />See Supply <br />ERECTION <br />By Subcontractor <br />$ <br />120,000.00 <br />MISC. METALS <br />PRECAST <br />REINFORCING <br />SUPPLY <br />By Subcontractor <br />$ <br />156,000.00 <br />INSULATION <br />See Erection <br />MEMBRANE <br />METAL <br />See Supply <br />MATERIAL <br />LABOR <br />SANITARY <br />WATER -For Fire Protection <br />Allowance <br />$ <br />10,000.00 <br />STORM <br />Allowance <br />$ <br />2,500.00 <br />SEPTIC TANK <br />Allowance <br />$ <br />8,000.00 <br />WELL <br />Allowance <br />$ <br />9,000.00 <br />PLUMBING <br />By Subcontractor <br />$ <br />25,990.00 <br />HVAC Ventilation <br />By Subcontractor <br />$ <br />128,132.00 <br />Prepared by Monte Helget <br />2of5 <br />No Land: $1,218,000.00 <br />$74.65 / sf <br />