My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.6. SR 10-17-2016
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2016
>
10-17-2016
>
4.6. SR 10-17-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2016 10:44:53 AM
Creation date
10/14/2016 10:44:22 AM
Metadata
Fields
Template:
City Government
type
SR
date
10/17/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Main Office: <br />3601 Thurston Avenue, Anoka, MN 55303 <br />Phone: 763/427-5860 Fax: 763/427-0520 <br />www.haa-inc.com <br /> <br />October 12, 2016 <br /> <br />Justin Femrite, City Engineer <br />City of Elk River <br />13065 Orono Parkway <br />Elk River, MN 55330 <br /> <br />RE: Proposal for Professional Engineering for Line Avenue <br /> <br />Dear Mr. Femrite: <br /> <br />Thank you for giving us the opportunity to provide this proposal. Our Project Understanding, <br />Proposed Scope of Services, Project Schedule, Project Team and Proposed Fee for this project are <br />described below. <br /> <br />PROJECT UNDERSTANDING <br /> <br />The project consists of the realignment and reconfiguration of Line Avenue and 5th Street. Line <br />Avenue currently connects Twin Lakes Road to Main Street. The current alignment of Twin Lakes <br />Road was constructed in 2003 making the Line Avenue connection unnecessary. The City is <br />considering constructing a cul-de-sac on Line Avenue south of the 5th Street intersection to eliminate <br />the north-south route that serves as a short cut through a residential area. The existing residences on <br />the west side of Line Avenue and commercial property on the east side of Line Avenue will continue <br />to have access from Line Avenue via Main Street. Line Avenue north of 5th Street will be realigned to <br />provide an east-west connection with 5th Street. The Dodge Avenue and 5th Street intersection will <br />also be realigned such that 5th Street west of Dodge Avenue forms a T intersection with the revised <br />alignment of Dodge Avenue and 5th Street. The approximate project limits and proposed realignments <br />are depicted in Figure 1 below. <br /> <br /> <br /> Figure 1. Approximate Project Limits
The URL can be used to link to this page
Your browser does not support the video tag.