My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5. SR 10-17-2016
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2016
>
10-17-2016
>
4.5. SR 10-17-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2016 10:01:41 AM
Creation date
10/14/2016 9:50:20 AM
Metadata
Fields
Template:
City Government
type
SR
date
10/17/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br />1.8 Hazardous Waste, Substances and Material Reporting: <br /> <br />• 1.08.01 If Contractor discovers any hazardous waste, hazardous substance, <br />petroleum or other deleterious material, including but not limited to any non- <br />containerized commodity or material, on or adjacent to Railway's Property, in or <br />near any surface water, swamp, wetlands or waterways, while performing any work <br />under this Agreement, Contractor must immediately: (a) notify the Railway's <br />Resource Operations Center at 1(800) 832-5452, of such discovery: (b) take <br />safeguards necessary to protect its employees, subcontractors, agents and/or third <br />parties: and (c) exercise due care with respect to the release, including the taking of <br />any appropriate measure to minimize the impact of such release. <br /> <br /> <br />1.9 Personal Injury Reporting <br /> <br />• 1.09.01 The Railway is required to report certain injuries as a part of compliance <br />with Federal Railroad Administration (FRA) reporting requirements. Any personal <br />injury sustained by an employee of the Contractor, subcontractor or Contractor's <br />invitees while on the Railway's Property must be reported immediately (by phone <br />mail if unable to contact in person) to the Railway's representative in charge of the <br />project. The Non-Employee Personal Injury Data Collection Form contained herein <br />is to be completed and sent by Fax to the Railway at 1(817) 352-7595 and to the <br />Railway’s Project Representative no later than the close of shift on the date of the <br />injury.
The URL can be used to link to this page
Your browser does not support the video tag.