My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. ERMUSR 10-11-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2016
>
10-11-2016
>
5.3. ERMUSR 10-11-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2016 10:47:21 AM
Creation date
10/10/2016 10:47:21 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
10/11/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River Municipal Utilities <br /> Proposed 2017 Utilities Fee Schedule <br /> Fee Description 2016 Proposed Proposed <br /> 2017 Increase <br /> New Residential Electric Connection-Developer-Lot with ERMU water service $ 475.00 $ 475.00 <br /> New Residential Electric Connection-Developer-Lot without ERMU water service $ 575.00 $ 575.00 <br /> New Residential Electric Connection-Builder $ 875.00 $ 875.00 <br /> New Wire Footages over 200'(per foot) $ 4.00 $ 4.00 <br /> New Service Frost Trenching(per foot) $ 5.00 $ 5.00 <br /> New Commercial&Industrial Electric Connection 50% 50% <br /> Service Upgrades or Additions for Existing Customers 100% 100% <br /> Minimum Temporary Electric Service Fee-Existing Transformer $ 150.00 $ 150.00 <br /> Minimum Temporary Electric Service Fee-Without Existing Transformer $ 500.00 $ 500.00 <br /> Street Light-30'Decorative Pole with 6'Arm and Fixture $ 1,850.00 $ 1,850.00 <br /> Street Light-23'Decorative Pole with Traditionaire Fixture $ 1,500.00 $ 1,500.00 <br /> Security Light-Wood Pole with Fixture $ 975.00 $ 975.00 <br /> Security Light-Existing Pole $ 125.00 $ 125.00 <br /> Pole Attachment Fee(per pole) $ 6.50 $ 6.50 <br /> Water Access Charge=Water Connection Charge+Water Availability Charge $ 3,425.00 $ 3,528.00 3.00% <br /> Water Connection Charge(Per Plumbing Unit)-Builder $ 3,090.00 $ 3,183.00 3.00% <br /> Water Availability Charge(Per Plumbing Unit)-Developer $ 335.00 $ 345.00 2.98% <br /> Abandoned Water Service $ 2,500.00 $ 2,500.00 <br /> Hydrant Water Sales-Rental(per week) $50.00 $50.00 <br /> Hydrant Water Sales-Units(per 1000 gallons) $ 4.00 $ 4.00 <br /> Deposit for 5/8"Hydrant Meter $ 150.00 $ 150.00 <br /> Deposit for 2 1/2"Hydrant Meter $ 1,000.00 $ 1,000.00 <br /> Private Hydrant Maintenance Program Monthly Fee $ 5.00 $ 5.00 <br /> ADMINISTRATIVE <br /> Administrative Fee for Continued Submission of Checks After No-Check Notice Given $ 20.00 $ 20.00 <br /> Billable Cost of Materials Markup 15% 15% <br /> Billable Labor Markup 55% 55% <br /> Billable Vehicle/Equipment(per employee per hour) $ 30.00 $ 30.00 <br /> Electric Service Disconnect/Trip Fee-Meter Technician $ 50.00 $ 50.00 <br /> Electric Service Disconnect/Trip Fee-Line Crew $ 150.00 $ 150.00 <br /> Energy Audit $ 50.00 $ 150.00 200% <br /> Meter Tampering Fee $ 250.00 $ 250.00 <br /> Meter Testing Fee $ 50.00 $ 50.00 <br /> NSF Fee $ 30.00 $ 30.00 <br /> Penalty Amount 10% 10% <br /> Photocopies(per page) $0.25 New <br /> Red Tag Handling Fee $ 20.00 $ 20.00 <br /> Water Shut-Off Fee $ 100.00 $ 100.00 <br /> 147 <br />
The URL can be used to link to this page
Your browser does not support the video tag.