Laserfiche WebLink
meeting this week where he will find out whether it will need to be moved or not. John <br /> Dietz had a question on the pickup trucks that were being replaced. Staff responded. <br /> Tom Sagstetter presented the Conservation Improvement Program(CIP) Budget which <br /> included detailed information about the cost of the specific programs as well as the historic <br /> participation numbers. A notable item for 2017 is the addition of an electric vehicle <br /> charging station for$58,000. Tom shared that ERMU has applied for a grant from the <br /> American Public Power Association (APPA)to help leverage our portion of the project. He <br /> explained that because the grant would only cover the soft costs of the project and could <br /> not be used towards the cost of the equipment, staff will be looking into other grant <br /> opportunities for the equipment itself. There was discussion on potential sites for the <br /> electric charging stations. <br /> 5.3 Performance Metrics Incentive Compensation—Evaluation of Criteria <br /> Upon the award of the Performance Metrics Incentive Compensation(PMIC) in April of <br /> this year, there was discussion on changing some of the metrics' measurements from those <br /> we started with in 2012. As the metrics needs to be set and determined prior to the fiscal <br /> year in which they are to be measured, staff recommended revisiting this topic before the <br /> 2017 budget was approved. <br /> Theresa Slominski presented an overview of the 10 year history of the metrics used for the <br /> score card and noted that based on the results of our 10 year history it's not a given that we <br /> make our goal every time. Theresa shared that after soliciting feedback from staff and the <br /> Commission on other items we may want to consider for measuring ourselves for the <br /> performance metrics, she was able to compile a list of suggestions and the means in which <br /> they could be measured. John Dietz led a discussion on the suggested options and the pros <br /> and cons of each of them. The Commission was in favor of some of the suggestions and <br /> directed staff to do some more research on the selected options and bring that information <br /> back for further consideration. <br /> 5.4 Wage& Benefits Committee Update <br /> Insurance Renewal- On August 22nd Theresa Slominski attended the City, County, Other <br /> Government Agency(CCOGA)meeting for our medical insurance pool and received our <br /> renewal increase of 19%. On September 12th the Wage and Benefits Committee met with <br /> our insurance broker and our BlueCross BlueShield(BCBS) representative to discuss some <br /> options on things we can do help mitigate the 19%increase. Based on the discussions, <br /> staff had put together a spreadsheet outlining some different renewal options for group <br /> medical insurance. Theresa explained the layout of the spreadsheet and went over the <br /> details on our current rates, our renewal rates, and three alternative options for <br /> consideration. In addition, she pointed out some of the differences between our current <br /> Aware Gold and HSA plan and the alternative options that were presented which included: <br /> Page 4 <br /> Regular Meeting of the Elk River Municipal Utilities Commission <br /> September 13,2016 <br /> 28 <br />