My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.6. SR 01-10-2005
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2005
>
01/10/2005
>
5.6. SR 01-10-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:03 AM
Creation date
1/7/2005 11:38:18 AM
Metadata
Fields
Template:
City Government
type
SR
date
1/10/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Memo to the Mayor and City Council <br />Public Works Master Plan <br />January I 0, 2005 <br />Page 3 <br /> <br />The above conditions have led staff to identify the need for cold and tempered storage. Cold <br />storage is unheated, but covered and would be utilized for the storage of barricades, traffic control <br />signs, manhole castings, etc. to be accessed quickly and easily especially if a water main or other <br />emergency were to occur and barricades and traffic control signs were needed at a moment's notice. <br />Currently these items are stored outside and are subject to the elements. Tempered storage would <br />be used for equipment/vehicles and would be heated to approximately 550, which would again <br />eliminate the need for the careful jigsaw puzzle of parking that currently occurs with the existing <br />building. This would allow the existing building to be utilized for summer equipment storage <br />maintaining all of the equipment on-site and under cover, which will prolong the life span of the <br />equipment. <br /> <br />In addition to the cold storage noted above, the salt storage building is an immediate replacement <br />request. This is due to the condition of the existing storage building, which is nearing collapse, and <br />the changes in salt storage requirements by the EP A/MPCA. These storage requirements require <br />mixing and storage to occur under cover to eliminate salt-laden water run-off into adjacent water <br />bodies / wetlands. <br /> <br />Components. Budget. and Phasing Plan: <br /> <br />The phasing plan and budget for the Public Works Master Plan is noted in the chart below. The <br />total cost to fill the storage needs is $3.5 million in 2004 dollars over the next 5-10 years. These <br />amounts include dollars for re-working the compost site and completing an interior remodel of the <br />lower level of the existing Public Works building. The components of the interior remodel include <br />an expanded sign-making area, new offices for the Street Superintendent, Street Foreman, Park <br />Foreman, relocated receptionist facilities and the creation oflocker facilities for staff. <br /> <br /> Public Works Master Plan Phasing and Budget <br />Item Square Footage Year Estimated Funding Source <br /> Amount <br />Prepare Master $38,000 Government <br />Grading Plan Buildings Fund <br />Prepare Building $5,000 Government <br />Plans and Specs Buildings Fund <br />Salt/Sand Storage 8,000 2005 $150,000 Government <br />Buildings Fund <br />Cold Storage 10,000 2005 $125,000 Government <br />Buildings Fund <br />Compost 2005 $155,000 Government <br />Relocation Buildings Fund <br />Parking Lot & Government <br />Driveway 2005 $79,000 Buildings Fund <br />Improvements . <br />Tempered As soon as <br />Storage #1 30,000 Funding is $1,500,000 To be <br /> Identified and Determined <br /> Available <br /> To Be <br />Interior Remodel 2008-09 $120,000 Determined <br />I I <br />
The URL can be used to link to this page
Your browser does not support the video tag.