My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.4. SR 08-15-2016
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2016
>
08-15-2016
>
7.4. SR 08-15-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2016 11:47:22 AM
Creation date
8/12/2016 9:28:34 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/15/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
regulating authority, the City may take such action as it deems appropriate to control erosion. The <br /> City will endeavor to notify the Developer in advance of any proposed action,but failure of the City <br /> to do so will not affect the Developer's and City's rights or obligations hereunder. If the Developer <br /> does not reimburse the City for any cost the City incurred for such work within ten (10) days, the <br /> City may draw down the letter of credit to pay any costs. No development, utility or street <br /> construction will be allowed and no building permits will be issued unless the plat is in full <br /> compliance with the approved erosion control plan. <br /> (04) Grading. The Subdivision shall be graded in accordance with the approved grading <br /> development and erosion control plan, Plan B. The plan shall conform to City specifications. <br /> Within thirty (30) days after completion of the grading and before the City approves individual <br /> building permits (except up to three model home permits on lots acceptable to the Building Official <br /> per section 18), the Developer shall provide the City with an "as constructed" grading plan certified <br /> by a registered land surveyor or engineer that all storm water treatment/infiltration basins and swales, <br /> have been constructed on public easements or land owned by the City. The "as constructed" plan <br /> shall include field verified elevations of the following: (a) cross sections of storm water <br /> treatment/infiltration basins; (b) location and elevations along all swales, wetlands, wetland <br /> mitigation areas if any, locations and dimensions of borrow areas/stockpiles, and installed <br /> "conservation area" posts; and (c) lot corner elevations and house pads, and all other items listed in <br /> the City Code. The City will withhold issuance of building permits until the approved certified <br /> grading plan is on file with the City and all erosion control measures, including full vegetation of <br /> entire site, are in place as determined by the City Engineer. The Developer certifies to the City that <br /> all lots with house footings placed on fill have been monitored and constructed to meet or exceed <br /> FHA/HUD 79G specifications. The soils observation and testing report, including referenced <br /> development phases and lot descriptions, shall be submitted to the Building Official for review prior <br /> to the issuance of building permits. <br /> (05) CleanUp. The Developer shall clean dirt and debris from all streets that has resulted from <br /> construction work by the Developer, home builders, subcontractors, their agents or assigns, until all <br /> requirements of this agreement have been satisfied. Prior to any construction in the plat, the <br /> Developer shall identify in writing a responsible party and schedule for erosion control, street <br /> cleaning,and street sweeping. <br /> (06) National Pollutant Discharge Elimination System Requirements. Prior to the <br /> commencement of any work,the Developer shall provide a signed Storm Water Pollution Prevention <br /> Plan for City review and approval to control erosion from the site. Because the site is over one (1) <br /> acre, the Developer shall also apply for and obtain an NPDES permit from the Minnesota Pollution <br /> Control Agency. <br /> (07) Municipal Separate Storm Sewer System Requirements. All stormwater management <br /> activities shall comply with the City MS4 permit. <br /> 15. Default. <br /> (01) Remedies. In the event of default by the Developer as to any of the work to be performed <br /> by it hereunder, the City may, at its option, perform the work and the Developer shall promptly <br /> reimburse the City for any expense incurred by the City, provided the Developer, except in an <br /> emergency as determined by the City,is first given notice of the work in default, not less than forty- <br /> eight (48) hours in advance. This Agreement is a license for the City to act, and it shall not be <br /> necessary for the City to seek a Court order for permission to enter the land. When the City does <br /> any such work,the City may,in addition to its other remedies,assess the cost in whole or in part. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.