My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.8. SR 12-20-2004
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2004
>
12/20/2004
>
5.8. SR 12-20-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:02 AM
Creation date
12/16/2004 4:28:32 PM
Metadata
Fields
Template:
City Government
type
SR
date
12/20/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PRETREATMENTPIPE REROUTING <br /> <br />Several pipes are routed to the existing grit basin and will need to be rerouted to the proposed <br />tame Construction sequencing will be analyzed further during final design. <br /> <br />Grit Waste Pipe <br />A 6-inch sludge pipe ITom the grit tank draws grit ITom the tank to the grit pumps. This <br />6-inch pipe needs to be rer=ted to the new grit tank. The sludge line would be routed <br />and reduced as needed to match up with the grit tank as specified by the manufacturer. <br /> <br />Grit Classifier Overflow Pipe I Floor Drain <br />Overflow ITom the grit cyclone and grit washer flows through a 6-inch pipe into the <br />existing grit tank. The pipe is to be rerouted to direct flow into the new grit system. <br />Overflow ITom the grit washer would flow into the channel leading to the grit tank. <br /> <br />Currently, flow ITom the grit classifier underdrain and the upper level floor drain are <br />routed to the sump pump. Both of these pipes are to be rerouted into the overflow line to <br />teed directly into the grit channel. The overflow line needs to be lowered to meet the <br />underdrain and floor drain pipes, and to increase ground cover over the pipe. <br /> <br />Sludge Waste Pipe <br />A 4-inch sludge pipe ITom the control building currently flows into the grit tank. The <br />sludge pipe directs waste sludge from the biological systems into the grit tank and <br />consequently, primary clarifiers. The sludge pipe needs to be rerouted into the new grit <br />system Sludge would flow through the line into the grit tank approach channel. <br /> <br />Digester Overflow Pipe <br />A 4-inch overflow pipe ITom the digesters feeds into the grit tank. Digester supernatant <br />flows to the grit tank through this pipe. This pipe needs to be rerouted into the new grit <br />system <br /> <br />Plant Water Pipe <br />A 4-inch pipe accommodates flow ITom a lift station, which pumps wastewater ITom the <br />plant into the existing grit tank. Wastewater and drain water generated by the plant flow <br />into this lift station. This pipe also needs to be rerouted into the new grit system <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.