71 City of Elk River - Parks and Recreation Master Plan Chapter 6: Implementation
<br />Park Priority Actions 2015 Cost Estimate Responsibility Initiatives
<br />Orono
<br />Skate Park $400,000 Parks and Recreation with Skate Group Improve Existing Parks and Facilities
<br />Adult Fitness Features $25,000 Parks and Recreation Improve Existing Parks and Facilities
<br />Splash Pad $650,000 Parks and Recreation Improve Existing Parks and Facilities
<br />Restrooms $250,000 Parks and Recreation, Public Works Improve Existing Parks and Facilities
<br />Parking lot paving (to follow concept plan)$600,000 Parks and Recreation, Public Works Improve Existing Parks and Facilities
<br />New and extended trail (to follow concept plan)$425,000 Parks and Recreation Improve Existing Parks and Facilities, Strengthen Trail
<br />Connections, Connect to the Rivers
<br />Youth Athletic Complex
<br />Restrooms $200,000 Parks and Recreation, Public Works Improve Existing Parks and Facilities
<br />Parking Lot Paving $600,000 Parks and Recreation, Public Works Improve Existing Parks and Facilities
<br />Finish Building $75,000 Parks and Recreation with Athletic Groups Improve Existing Parks and Facilities
<br />Maintenance Shed $75,000 Parks and Recreation with Athletic Groups Improve Existing Parks and Facilities
<br />Field Lights – (1-6)$800,000 Parks and Recreation with Athletic Groups Improve Existing Parks and Facilities
<br />Playground $175,000 Parks and Recreation with Athletic Groups Improve Existing Parks and Facilities
<br />Upgrade Irrigation and Well $20,000 Parks and Recreation with Athletic Groups Improve Existing Parks and Facilities
<br />Additional Fencing $5,000 Parks and Recreation with Athletic Groups Improve Existing Parks and Facilities
<br />Woodland Trails Maintenance Shed $100,000 Parks and Recreation with Woodland Trails Volunteers
<br />Improve Existing Parks and Facilities, Strengthen
<br />Trail Connections, Preserve Natural Resources and
<br />Greenways
<br />Neighborhood Parks (various)On-going, based on amenity life-cycle and
<br />replacement needs
<br /> Amenity life-cycle
<br />replacement costs - TBD
<br />based on individual park
<br />needs over time
<br />Parks and Recreation Improve Existing Parks and Facilities
<br />Bailey Point Nature Preserve
<br />Nature Preserve Improvements (trailhead, parking
<br />lot, natural resource restoration, picnicking,
<br />signage, boardwalk, bridge, trails, site amenities).
<br />$640,000 Parks and Recreation
<br />Improve Existing Parks and Facilities, Strengthen Trail
<br />Connections, Connect to the Rivers, Preserve Natural
<br />Resources and Greenways
<br />Trails
<br />Trail gaps/neighborhood connections to Great
<br />Northern Trail $3,250,000 Public Works, Planning, Parks and Recreation Strengthen Trail Connections
<br />Complete trail connection between Mississippi
<br />River/Main Street and the Great Northern Trail $1,400,000 Public Works, Planning, Parks and Recreation Strengthen Trail Connections, Connect to the Rivers
<br />Sign trail connections as part of the Signage and
<br />Wayfinding Plan
<br />Based on signage and
<br />wayfinding master plan
<br />(currently in process)
<br />Public Works, Parks and Recreation Strengthen Trail Connections
<br />All Parks Park signage as part of the Signage and Wayfinding
<br />Plan
<br />Based on signage and
<br />wayfinding master plan
<br />(currently in process)
<br />Parks and Recreation Improve Existing Parks and Facilities
<br />Buildings
<br />Comprehensive recreation facilities study to
<br />evaluate the Activity Center (55+), Arena, Lions
<br />Park Center, and the Trott Brook Barn and
<br />determine if they should be renovated, replaced on
<br />their current site, or consolidated into a centrally
<br />located facility
<br />Administration, Parks and Recreation, Planning,
<br />Public Works, ISD 728 Improve Existing Parks and Facilities
<br />Oak Knoll Parking lot upgrades, toilets, lights, bleachers,
<br />better back stops $575,000 Parks and Recreation, ISD 728 Improve Existing Parks and Facilities
<br />Table 6.1 Priorities - Momentum Actions and Projects
|