Laserfiche WebLink
71 City of Elk River - Parks and Recreation Master Plan Chapter 6: Implementation <br />Park Priority Actions 2015 Cost Estimate Responsibility Initiatives <br />Orono <br />Skate Park $400,000 Parks and Recreation with Skate Group Improve Existing Parks and Facilities <br />Adult Fitness Features $25,000 Parks and Recreation Improve Existing Parks and Facilities <br />Splash Pad $650,000 Parks and Recreation Improve Existing Parks and Facilities <br />Restrooms $250,000 Parks and Recreation, Public Works Improve Existing Parks and Facilities <br />Parking lot paving (to follow concept plan)$600,000 Parks and Recreation, Public Works Improve Existing Parks and Facilities <br />New and extended trail (to follow concept plan)$425,000 Parks and Recreation Improve Existing Parks and Facilities, Strengthen Trail <br />Connections, Connect to the Rivers <br />Youth Athletic Complex <br />Restrooms $200,000 Parks and Recreation, Public Works Improve Existing Parks and Facilities <br />Parking Lot Paving $600,000 Parks and Recreation, Public Works Improve Existing Parks and Facilities <br />Finish Building $75,000 Parks and Recreation with Athletic Groups Improve Existing Parks and Facilities <br />Maintenance Shed $75,000 Parks and Recreation with Athletic Groups Improve Existing Parks and Facilities <br />Field Lights – (1-6)$800,000 Parks and Recreation with Athletic Groups Improve Existing Parks and Facilities <br />Playground $175,000 Parks and Recreation with Athletic Groups Improve Existing Parks and Facilities <br />Upgrade Irrigation and Well $20,000 Parks and Recreation with Athletic Groups Improve Existing Parks and Facilities <br />Additional Fencing $5,000 Parks and Recreation with Athletic Groups Improve Existing Parks and Facilities <br />Woodland Trails Maintenance Shed $100,000 Parks and Recreation with Woodland Trails Volunteers <br />Improve Existing Parks and Facilities, Strengthen <br />Trail Connections, Preserve Natural Resources and <br />Greenways <br />Neighborhood Parks (various)On-going, based on amenity life-cycle and <br />replacement needs <br /> Amenity life-cycle <br />replacement costs - TBD <br />based on individual park <br />needs over time <br />Parks and Recreation Improve Existing Parks and Facilities <br />Bailey Point Nature Preserve <br />Nature Preserve Improvements (trailhead, parking <br />lot, natural resource restoration, picnicking, <br />signage, boardwalk, bridge, trails, site amenities). <br />$640,000 Parks and Recreation <br />Improve Existing Parks and Facilities, Strengthen Trail <br />Connections, Connect to the Rivers, Preserve Natural <br />Resources and Greenways <br />Trails <br />Trail gaps/neighborhood connections to Great <br />Northern Trail $3,250,000 Public Works, Planning, Parks and Recreation Strengthen Trail Connections <br />Complete trail connection between Mississippi <br />River/Main Street and the Great Northern Trail $1,400,000 Public Works, Planning, Parks and Recreation Strengthen Trail Connections, Connect to the Rivers <br />Sign trail connections as part of the Signage and <br />Wayfinding Plan <br />Based on signage and <br />wayfinding master plan <br />(currently in process) <br />Public Works, Parks and Recreation Strengthen Trail Connections <br />All Parks Park signage as part of the Signage and Wayfinding <br />Plan <br />Based on signage and <br />wayfinding master plan <br />(currently in process) <br />Parks and Recreation Improve Existing Parks and Facilities <br />Buildings <br />Comprehensive recreation facilities study to <br />evaluate the Activity Center (55+), Arena, Lions <br />Park Center, and the Trott Brook Barn and <br />determine if they should be renovated, replaced on <br />their current site, or consolidated into a centrally <br />located facility <br />Administration, Parks and Recreation, Planning, <br />Public Works, ISD 728 Improve Existing Parks and Facilities <br />Oak Knoll Parking lot upgrades, toilets, lights, bleachers, <br />better back stops $575,000 Parks and Recreation, ISD 728 Improve Existing Parks and Facilities <br />Table 6.1 Priorities - Momentum Actions and Projects