Laserfiche WebLink
Division Performance Measures & Goals for 2017 <br />Division: IStreet Maintenance <br />Completed by: I Mark Thompson <br />Date: JJune 7, 2016 <br />Performance Measure <br />2015 Actual <br />2016 Estimated <br />2017 Projected <br />PCI >_ 80 <br />NA <br />82 <br />82 <br />Sealcoat miles <br />9.45 <br />1 <br />1 -2 <br />Crack seal miles <br />17.64 <br />20+ <br />20+ <br />Sweeping streets 2x's yearly <br />yes <br />2 + times <br />2 + times <br />ROW maintenance <br />- mowing (>_ 2 times) <br />2 <br />2+ <br />2+ <br />- tree trimming <br />Division Goal <br />Related Goal Objective <br />Improve marginal streets to extend pavement Crack seal, pothole repair, mill and overlay, reclamation, and other procedures <br />life I help keep street surfaces in good condition. <br />Improve roadway safety Routine street sweeping and ROW maintenance to reduce impacts on storm <br />sewers; also helps reduce accidents on loose gravel. <br />Maintain a high quality sign program that aligns Complete retroreflectivity requirements; repair/replaced damaged or missing <br />with the Way Finding Plan signs as soon as they are identified. <br />