My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3B PCSR 07-26-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2016
>
07-26-2016
>
4.3B PCSR 07-26-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2016 4:37:43 PM
Creation date
7/21/2016 4:27:03 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
7/26/2016
case
CU 16-20
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCGC Renovation and Expansion <br /> Site Plan Review Response <br /> July 15,2016 <br /> Page 2of2 <br /> within the jail. <br /> d. Finally,Corrections Officers maintain a strict inventory of inmate's clothing and other items that are issued to <br /> them. When items are issued,inmates exchange their items,one for one,meaning one pair of socks for one <br /> pair of socks as an example. They should never have extra unaccounted for items issued to them-not to say it <br /> never happens,but it shouldn't. This is managed by staff and directed by jail policy. <br /> In summary,several measures have been put in place to stop the introduction of undesirable items entering the <br /> sanitary sewer system. Therefore,the County doesn't plan on doing any sanitary sewer modifications. <br /> 5. Additional detailing of driveway access to the south will be needed should that alternative be selected. <br /> Response:An enlarged plan will be added to 234.CG showing that access connection to Mississippi Road NW. <br /> Stormwater <br /> 1. A MIDS report is needed. <br /> Response:A MIDS report has been completed and will be provided to city staff the week of July 18. <br /> 2. Note that the project is within one mile of an impaired water; Lake Orono and within one mile of a special water; <br /> Mississippi River. <br /> Response:This information will be included in the SWPPP document once that is prepared after the Contractor is <br /> selected and prior to work commencing. <br /> 3. A detailed maintenance schedule is needed for each of the permanent BMPs and who will be responsible. <br /> Response:A draft maintenance document will be provided for City review prior to the start of construction. Once <br /> approved the County will assume responsibility. <br /> 4. Add all required NPDES SWPP details.An issued NPDES permit is required before the project can start land <br /> disturbing activity. <br /> Response:Once selected,the Contractor will apply for the MPCA General Permit. The Civil Engineer will prepare the <br /> SWPPP and include all required details and information. <br /> 5. Add required detail for the temporary sedimentation basin. <br /> Response:Additional temporary sedimentation basin information will be on 235.CE. The Contractor will be <br /> responsible for amending that basin,or any SWPPP BMP,if the site requires. <br /> Building Materials <br /> 1. The building materials meet the requirements of Section 30-1294. <br /> Response:No action required. <br /> Environmental <br /> 1. Environmental staff suggests working with the Elk River Municipal Utilities and city staff to incorporate energy <br /> efficient and sustainable design. <br /> Response:The County and the design and construction teams are committed to sustainability. Conversations are <br /> underway with Elk River Municipal Utilities and the project plans to participate in the Sherburne County landfill <br /> abatement legacy grant. <br /> Landscaping <br /> 1. Provide a detailed landscape plan indicating the types and quantities of plantings. <br /> Response:Those drawings are attached in pdf form. <br /> Please let me know if any additional information or clarification is required in preparation for the Planning Commission <br /> meeting. <br /> G:\1510500\06-Issued\2016-06-27 Site Plan Review\2016-07-15 SCGC Site Plan Review Response.docx <br />