My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 07-18-2016
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2016
>
07-18-2016
>
8.1. SR 07-18-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2016 12:54:12 PM
Creation date
7/15/2016 11:13:03 AM
Metadata
Fields
Template:
City Government
type
SR
date
7/18/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Program: <br />A primary concern in the development of a new community center is replacing and upgrading <br />the existing recreation facilities in the City of Elk River. These include the Ice Arena, Activity <br />Center and Lion’s Park facility. These facilities have become aged and require significant <br />improvements while the City loses some operation efficiency by operating three separate <br />recreation facilities. The program recommendations for the City of Elk River were driven by the <br />information gathered during the market analysis, including the demographic profile of the <br />community, statistical data from the National Sporting Goods Association, stakeholder input, <br />competitive analysis of other recreation and banquet facilities in the area and community input <br />meetings. During the program phase of the study, different options were explored before <br />developing a phasing plan. The first phase of the project reflects the most pressing needs in the <br />community. Based on the market analysis, program assessment and budgetary considerations the <br />following program summary was generated. Refer to the program section of the primary <br />document for the full program breakdown. <br /> <br />Operations: <br />An operation analysis was conducted to examine facility costs and revenues for a new recreation <br />facility that was developed during the programming phase of the study. The operating pro-forma <br />developed represents a conservative approach to estimating expenses and revenues and was <br />completed based on the best information available and a basic understanding of the project. Fees <br />and charges utilized for this study were generated from the existing rate structure and assessment <br />of market value in the Elk River area. <br />The results of the operations analysis indicate that the proposed facility will not recover 100% of <br />its operating costs through revenue but represents an upgrade over the current operating model <br />through improved efficiency of combining three operations into one and increased revenue <br />opportunities. The operating efficiency increase by adding a third sheet of ice in phase two and a <br />sports dome in phase three resulting is a cost recovery rate of 86% and 91% respectively. The <br />operating pro-forma does not include debt service since the funding for this project is yet to be <br />determined. Most community centers in urban areas around the country recover 75% to 95% of <br />their operating expenses through fees and charges. <br /> <br /> <br /> <br /> <br /> <br /> <br />APPENDIX A
The URL can be used to link to this page
Your browser does not support the video tag.