Laserfiche WebLink
To: Planning Department <br />Memorandum <br />From: Brandon Wisner, Stormwater Coordinator <br />Date: June 8, 2016 <br />Subject: Site Plan Review Meeting —June 6, 2016 <br />The department listed above has reviewed the application(s) listed below and has the following <br />comments: <br />1. Case # P 16-08, CU 16-18 — ERX Tech Shops/Aggregate Commercial 4 I Plat <br />1. Maintenance schedule for permanent stormwater BMPs is required. <br />2. The proposed infiltration basin requires silt fence/bio-logs to protect the basin during <br />construction. <br />3. An issued NPDES permit is required before land disturbing activity can commence. <br />4. Remove drainage and utility easement on private stormwater BMP, maintenance <br />schedule will be sufficient instead because this is private property and drainage. <br />