My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4. PRSR 07/13/2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2011-2020
>
2016
>
07-13-2016
>
5.4. PRSR 07/13/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2016 3:42:59 PM
Creation date
7/11/2016 3:42:59 PM
Metadata
Fields
Template:
City Government
type
PRSR
date
7/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 6.1 Priorities - Momentum Actions and Projects <br /> IIIIIRio tj Actions $ .a . . ost Estimatejj <br /> Skate Park $400,000 <br /> Adult Fitness Features $25,000 <br /> Splash Pad $650,000 <br /> Orono Restrooms $250,000 <br /> Parking lot paving(to follow concept plan) $600,000 <br /> New and extended trail(to follow concept plan) $425,000 <br /> Restrooms $200,000 <br /> Parking Lot Paving $600,000 <br /> Finish Building $75,000 <br /> Maintenance Shed $75,000 <br /> Youth Athletic Complex <br /> Field Lights— (1-6) $800,000 <br /> Playground I $175,000 <br /> Upgrade Irrigation and Well $20,000 <br /> Additional Fencing $5,000 <br /> Woodland Trails Maintenance Shed $100,000 <br /> Amenity life-cycle <br /> Neighborhood Parks(various) On-going,based on amenity life-cycle and replacement costs-TBD <br /> replacement needs based on individual park <br /> needs over time <br /> Nature Preserve Improvements(trailhead,parking <br /> Bailey Point Nature Preserve lot,natural resource restoration,picnicking, $640,000 <br /> signage,boardwalk,bridge,trails,site amenities). <br /> Trail gaps/neighborhood connections to Great $3,250,000 <br /> Northern Trail <br /> Complete trail connection between Mississippi $1,400,000 <br /> Trails River/Main Street and the Great Northern Trail <br /> Sign trail connections as part of the Signage and Based on signage and <br /> Wayfinding Plan wayfinding master plan <br /> (currently in process) <br /> Park signage as part of the Signage and Wayfinding Based on signage and <br /> All Parks Plan wayfinding master plan <br /> (currently in process) <br /> Comprehensive recreation facilities study to <br /> evaluate the Activity Center(55+),Arena,Lions <br /> Buildings Park Center,and the Trott Brook Barn and <br /> determine if they should be renovated, replaced on <br /> their current site,or consolidated into a centrally <br /> located facility <br /> Oak Knoll Parking lot upgrades,toilets,lights,bleachers, $575,000 <br /> better back stops <br /> 11 City of Elk River-Parks and Recreation Master Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.