My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. SR 12-06-2004
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2004
>
12/06/2004
>
4.1. SR 12-06-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:00 AM
Creation date
12/3/2004 8:45:51 AM
Metadata
Fields
Template:
City Government
type
SR
date
12/6/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />July 2004 EDA Meeting Notes <br /> <br />PRIORITY ISSUE #3: <br /> <br />TRANSPORTATION <br /> <br />What is the issue? <br />Increasing amounr of traffic causing congestion <br />Local and regional connections <br />Transit (public) <br />Loss of available land for road systems as it becomes developed <br /> <br />Whr an issue? <br />Congestion at peak times <br />Specific areas of poor traffic flow daily <br />Lack of jurisdictional control and input on plans <br /> <br />Consequences of doing nothing: <br />Development opportunities bypass Elk River <br />Customers/residents/businesses perceive traffic as problem in the community and leave Elk <br />River <br />Public safety <br />MnDot plans could isolate/limit access to areas (e.g. downtown) <br /> <br />VISION ALTERNATIVES 3-5 years <br /> <br />Better traffic flow <br />Proactive planning and guiding of development based on various needs (industrial, commercial, <br />residential, commuter, public safety, etc) <br />Alternative east-west route(s) to Hwy 10/160 <br /> <br />BARRIERS <br /> <br />. Limited availability of undeveloped land <br />. Cost of infrastructure/ operations <br />. Time to plan/ design/build <br />. Cost of acquisition/relocation of existing properties <br />. Roads with issues are not necessarily under the City's jurisdiction <br />. Long term - MnDot Plan for Hwy 10 - 20 years <br />
The URL can be used to link to this page
Your browser does not support the video tag.