My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5. SR 07-05-2016
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2016
>
07-05-2016
>
4.5. SR 07-05-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2016 9:57:59 AM
Creation date
7/1/2016 8:06:25 AM
Metadata
Fields
Template:
City Government
type
SR
date
7/5/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consultant / Section <br /> B. Hourly Rates: <br /> Hakanson Anderson Hourly Rates for these projects will be as follows: <br /> ................................................................................................................ <br /> ................................................................................................................ <br /> ................................................................................................................ <br /> ................................................................................................................ <br /> Job Classification Hourly Billing Rate <br /> Craig Jochum -Principal -in-Charge $120 <br /> Shane Nelson, Project Manager $112 <br /> Tim Eggerichs, Lead Design Engineer $107 <br /> Brent Larson, Design Engineer $103 <br /> Adam Thiele, Design Engineer $103 <br /> Ethan Peterson, Traffic Engineer $103 <br /> Dave St. Dennis, Lead CADD Technician $90 <br /> Kaci Fisher, Environmental Specialist $85 <br /> Seth Monroe, GIS $85 <br /> Charlie Christopherson, PLS $107 <br /> Brian Person, Survey Crew Chief $85 <br /> Jon Halter, Construction Observer $85 <br /> Senior Technician $75 - $90 <br /> Technician $50 - $75 <br /> Clerical $50 <br /> .................... <br /> Robotic Total Station $35 per hour <br /> Construction Observation Mileage Current IRS Rate <br /> C. Reimbursable Costs <br /> Hakanson Anderson charges for robotic total stations and mileage for construction observers as shown in <br /> the schedule above. These expenses are included in our Not to Exceed cost. All our expenses are <br /> included in our hourly rates. Hakanson Anderson will pay directly for the permit fees, and invoice these <br /> expenses to the City at the actual cost. <br /> D. Not to Exceed Cost <br /> Hakanson Anderson's Not to Exceed cost for Project 1 is $196,200. <br /> Hakanson Anderson's Not to Exceed cost for Project 2 is $108,300. <br /> E. Proposal Time Period <br /> This proposal shall remain valid until September 30, 2016. <br /> Consultant Cost, Page 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.