My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5. SR 07-05-2016
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2016
>
07-05-2016
>
4.5. SR 07-05-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2016 9:57:59 AM
Creation date
7/1/2016 8:06:25 AM
Metadata
Fields
Template:
City Government
type
SR
date
7/5/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IProposed Project Team and Experience - Section 4 <br /> Project Example No. 6 City of <br /> City of St.Michael t• Michael <br /> 11800 Town Center Drive NE <br /> St. Michael, MN 55376 <br /> (763)416-7931 <br /> Contact Person(s): <br /> Steve Bot, City Administrator/Engineer <br /> Consultant Engineer <br /> 2015 MSA Street Rehabilitation and Local Street Rehabilitation Projects <br /> The City of St. Michael retained Hakanson Anderson to prepare detailed plans and specifications for the <br /> rehabilitation of several Municipal State Aid (MSA) streets, including Jamison Avenue, Frankfort Parkway, 34th <br /> Street, Carissa Lane, and Oakwood Parkway. This project consisted of milling the bituminous wearing course, <br /> installing paving fabric to add strength and reduce reflection cracking, and constructing a new bituminous wearing <br /> course. Sub-surface drainage was also added in select locations and numerous storm sewer manholes were <br /> rehabilitated. <br /> Shortly after completing the plans for the MSA project,the City asked us to assist with plans and specifications for <br /> a local street rehabilitation project. This project was similar in scope to the MSA project, however, it was 100% <br /> City funded. Both projects were successfully completed in 2015. <br /> Project Cost: $1.3 Million <br /> Design Criteria: Municipal State Aid and City Standards <br /> Funding: Municipal State Aid and Local <br /> Status: Constructed <br /> Proposed Team Members Roles: <br /> Shane Nelson,: Project Manager f <br /> Tim Eggerichs: Design Engineer <br /> Craig Jochum: QA/QC Reviewer �, <br /> �ri 7 <br /> e,x wx Rnxs MINNESOTADEPARTMENT OF TRANSPORTATION�•,cw.exc s,.xP MEERl T 1 ���w..ei.,�.—'D <br /> cox ,e,...ousow .e .emiwra:sMluµewc�.oe.�..w P—N. xa .^^,^,.�... " �-^� <br /> Ei <br /> ® 000 — <br /> � 0 0 0 <br /> 0 o00 0° <br /> � rn <br /> 0000000 00 o0o0000o <br /> - 000 00 0 <br /> /r <br /> Min W-2-M-NOT <br /> E <br /> X. w <br /> PROJECT of 1-rMIMA a �L <br /> LOCRTION wo d,p /r✓ <br /> - <br /> i4 <br /> Proposed Project Team and Experience, Page 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.