Laserfiche WebLink
IProposed Project Team and Experience - Section 4 <br /> Project Example No. 4 <br /> City of Elk River <br /> 13065 Orono Parkway <br /> Elk River, MN 55330 ,� <br /> (763) 635-1051 Eik .� <br /> ever <br /> Contact Person(s): <br /> Justin Femrite, P.E. <br /> City Engineer <br /> Nature's Edge Business Center-Phase 1 Improvements <br /> The City of Elk River retained Hakanson Anderson in 2012 to implement the Nature's Edge Business Center - <br /> Phase 1 Improvements. The project consisted of the design and construction of improvements to public <br /> infrastructure including sanitary sewer, watermain, storm sewer, and street improvements. Hakanson Anderson <br /> also provided all survey and platting for the project. <br /> Ultimate improvements included the extension of Twin Lakes Road from its current location towards the future <br /> connection with Trunk Highway 10. The ultimate buildout will include a multi-lane roundabout and will require <br /> the re-alignment of 171" Avenue. Twin Lakes Road will serve as a major collector, utilizing an urban four-lane <br /> divided roadway section. The two lane urban roadway constructed with the 2012 improvements will ultimately <br /> become the easterly half of the future Twin Lakes Road cross section. Hakanson Anderson planned and designed <br /> the ultimate improvements by completing the preliminary engineering work, including the full geometric layout, <br /> lane configurations, traffic engineering, roundabout layout, and storm water management. By completing this <br /> preliminary engineering work, the City can be assured that the 2012 Improvements will compliment the ultimate <br /> improvements and that future right-of-way has been secured. <br /> The project included a series of infiltration ponds and pipes to manage current and future stormwater runoff <br /> volumes. The construction also included the excavation of over 90,000 cubic yards of soil to provide a earth <br /> balance on three newly platted commercial lots. <br /> Project Cost: $1,164,000 <br /> Design Criteria: Municipal State Aid and City Standards <br /> Funding: Local and DEED <br /> Status: Constructed <br /> Proposed Team Members Roles: <br /> Craig Jochum: Project Manager Dave St. Dennis: CADD Technician <br /> Tim Eggerichs: Design Engineer Brian Person: Platting & Staking <br /> Shane Nelson: Design Engineer <br /> NATURES EDGE BUSINESS CENTER <br /> c e <br /> r <br /> Proposed Project Team and Experience, Page 17 <br />