My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. EDSR 06-28-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Joint Finance Committee
>
Packets
>
2016
>
06-28-2016
>
4.1. EDSR 06-28-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 8:07:20 AM
Creation date
6/28/2016 8:07:20 AM
Metadata
Fields
Template:
City Government
type
EDSR
date
6/28/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
local government. <br /> • To enhance and diversify the City of Elk River's economic base. <br /> • To significantly increase the City of Elk River's tax base. <br /> III. CITY OF ELK RIVER POLICIES FOR THE USE OF TIF <br /> a. When possible,TIF shall be used to finance public improvements associated <br /> with the project. The priority for the use of TIF funds is: <br /> 1. Public improvements,legal,administrative,and engineering costs. <br /> 2. Site preparation,site improvement,land purchase,and demolition. <br /> 3. Capitalized interest,bonding costs. <br /> 3. a ._ :_ .�—l— <br /> b <br /> TT,._ 1__ _ _:a_.__a _ ft efts_ 1__ efts_L__:_ <br /> b. All projects must meet one of the following statutory TIF district categories. <br /> Redevelopment District Alinn. State Statutes 469.974,Subd. 90; Formatted:Indent:Left: 1.17" <br /> 469.976,Subd.4i1 <br /> Formatted:Indent:Left: 0.5",First line: <br /> ■ Buildings,streets,other improvements occupv 70%of the area,and, 0.42" <br /> more than 50%of the main buildings are substandard(substantial Formatted:Bulleted+Level: 1+Aligned at: <br /> 1.17"+Indent at: 1.42" <br /> renovation or clearance justified;cost of attaining State building code <br /> exceeds 15%of the cost of a new structure). <br /> ■ At least 90%of the tax increment revenues must be used <br /> to correct the conditions that allow redevelopment district <br /> designation. Such costs include:land acquisition, <br /> demolition,land clearance,utility installation,roads, <br /> sidewalks,and parking facilities. <br /> ■ Maximum term 25 years after receipt of the first increment. <br /> Renewal&Renovation District/Minn. State Statutes 469.974,Subd. Formatted:Indent:Left: 1.17" <br /> 90a;469.976,Subd. 4�7 <br /> • Buildings,street,other improvements occupv 70%of area; Formatted:Bulleted+Level: 1+Aligned at: <br /> and at least 20%of the buildings are substandard �as defined 1.25"+Indent at: 1.5" <br /> under Redeve&mentDistr4;and,30%of the other buildings <br /> require substantial renovation or clearance to remove <br /> City of Elk River Tax Increment Financing Policy&Application p 1 W E B E 0 B1 <br /> Amended February 2014 <br /> Page 5of15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.