My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1 BASR 06-28-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Board of Adjustments
>
BOA Packets
>
2010-2019
>
2016
>
06-28-2016
>
5.1 BASR 06-28-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2016 4:49:54 PM
Creation date
6/23/2016 11:01:15 AM
Metadata
Fields
Template:
City Government
type
BASR
date
6/28/2016
case
V 16-05
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of <br /> Elk is( 111 :: <br /> ,,../..., Memorandum <br /> River <br /> To: Planning Commission <br /> From: Kristin Mroz,Environmental Technician <br /> Date: June 23,2016 <br /> Subject: 18681 Ulysses St NW <br /> On June 14,2016,BrieAnna Simon and I visited this property in order to determine the <br /> wetland boundary and measure for the 45 ft. setback.According to our measurements,this <br /> deck will remain outside of the 25 foot Wetland Buffer Strip but will encroach into the <br /> Wetland Buffer Strip setback as determined by 10.5 feet. <br /> Recommendations for this encroachment include restoration of the 25 ft. Wetland Buffer <br /> Strip to natural vegetation to reduce chemical and rainwater runoff into the wetland and <br /> signage stating the location of the Wetland Buffer Strip as a no-mow area. <br /> rill <br /> C:\Users\bsimon\Desktop\memo-Werk-Environmental.docx NATURE <br />
The URL can be used to link to this page
Your browser does not support the video tag.