Laserfiche WebLink
Generated with <br />Version 4.00-02 <br />Control Type: <br />Analysis Method <br />Analysis Period: <br />Intersection Setup <br />Appendix D - Capacity Analysis Backup <br />Spark <br />Intersection Level Of Service Report <br />Intersection 3: Twin Lakes Rd & Line Ave <br />Two-way stop Delay (sec / veh): 239.6 <br />HCM 2010 Level Of Service: F <br />15 minutes Volume to Capacity (v/c): 1.151 <br />Name <br />Twin Lakes Rd <br />Twin Lakes Rd <br />Line Ave <br />Line Ave <br />Approach <br />Northbound <br />Southbound <br />Eastbound <br />Westbound <br />Lane Configuration <br />#11 r <br />I Imo► <br />+ <br />+ <br />Turning Movement <br />Left Thru Right <br />Left Thru Right <br />Left Thru Right <br />Left Thru TRght <br />Lane Width [ft] <br />12.00 12.00 12.00 <br />12.00 12.00 12.00 <br />12.00 12.00 12.00 <br />12.00 12.00 12.00 <br />No. of Lanes in Pocket <br />1 1 <br />0 1 <br />0 0 <br />0 0 <br />Pocket Length [ft] <br />100.00 100.00 <br />175.00 <br />1.0000 <br />1.0000 <br />Speed [mph] <br />40.00 <br />40.00 <br />30.00 <br />30.00 <br />Grade [%] <br />0.00 <br />0.00 10.00 <br />3.00 <br />0.00 <br />Crosswalk <br />Yes <br />Yes <br />Yes <br />Yes <br />volumes <br />Name <br />Twin Lakes Rd <br />Twin Lakes Rd <br />Line Ave <br />Line Ave <br />Base Volume Input [veh/h] <br />55 <br />191 <br />9 <br />0 <br />111 <br />168 <br />361 <br />13 <br />23 <br />2 <br />1 11 <br />0 <br />Base Volume Adjustment Factor <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />Heavy Vehicles Percentage [%] <br />3.00 <br />4.00 <br />3.00 <br />3.00 <br />4.00 <br />3.00 <br />3.00 <br />3.00 <br />3.00 <br />3.00 <br />3.00 <br />3.00 <br />Growth Rate <br />1.00 <br />1 1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />In -Process Volume [veh/h] <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />_77-6 <br />0 <br />Site -Generated Trips [veh/h] <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />_77-6 <br />0 <br />Diverted Trips [veh/h] <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />_77-6 <br />0 <br />Pass -by Trips [veh/h] <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Existing Site Adjustment Volume [veh/h] <br />125 <br />149 <br />6 <br />0 <br />158 <br />-158 <br />151 <br />-6 <br />129 <br />11 <br />-11 <br />0 <br />Other Volume [veh/h] <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Total Hourly Volume [veh/h] <br />180 <br />340 <br />15 <br />0 <br />269 <br />10 <br />210 <br />7 <br />152 <br />13 <br />0 <br />0 <br />Peak Hour Factor <br />0.9600 <br />0.9600 <br />0.9600 <br />0.9600 <br />0.9600 <br />0.9600 <br />0.9600 <br />0.9600 <br />0.9600 <br />0.9600 <br />0.9600 <br />0.9600 <br />Other Adjustment Factor <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />Total 15 -Minute Volume [veh/h] <br />47 <br />89 <br />4 <br />0 <br />70 <br />3 <br />55 <br />2 <br />40 <br />3 <br />0 <br />0 <br />Total Analysis Volume [veh/h] <br />188 <br />354 <br />16 <br />0 <br />280 <br />10 <br />219 <br />7 <br />158 <br />14 <br />0 <br />0 <br />Pedestrian Volume [ped/h] <br />0 <br />10 <br />10 <br />10 <br />Line Avenue Operations <br />Scenario 6: 6: PM - Alt C <br />Traffic Impact Study D125 Line Avenue Operations <br />