Laserfiche WebLink
Appendix D - Capacity Analysis Backup <br />Generated with <br />Version 4.00-02 <br />Snack <br />Intersection Level Of Service Report <br />Intersection 5: Line Ave & Main St <br />Control Type: Signalized Delay (sec / veh): 12.9 <br />Analysis Method: HCM 2010 Level Of Service: B <br />Analysis Period: 15 minutes Volume to Capacity (v/c): 0.393 <br />Intersection Setup <br />Name <br />Zane Ave <br />Line Ave <br />Line Ave <br />Main St <br />Main St <br />181 st Ave <br />Approach <br />181 st Ave <br />Northbound <br />Base Volume Input [veh/h] <br />Southbound <br />19 <br />Eastbound <br />29 <br />26 <br />Westbound <br />Lane Configuration <br />381 <br />#7 I"► <br />1 <br />1 <br />16 <br />*1� <br />30 <br />l j r <br />1.0000 <br />1 1.0000 <br />i l F <br />Turning Movement <br />Left <br />Th1ru Right <br />Left <br />Thru Right <br />Left <br />Thru <br />Right <br />Left <br />Thru Right <br />Lane Width [ft] <br />12.00 <br />12.00 12.00 <br />12.00 <br />12.00 12.00 <br />12.00 <br />12.00 <br />12.00 <br />12.00 <br />12.00 12.00 <br />No. of Lanes in Pocket <br />2 <br />0 <br />1 <br />0 <br />1 <br />1.00 <br />1 <br />1 <br />0 <br />Pocket Length [ft] <br />225.00 <br />1.00 <br />75.00 <br />1.00 <br />175.00 <br />0 <br />75.00 <br />100.00 <br />0 <br />Speed [mph] <br />0 <br />30.00 <br />130.00 <br />0 <br />135.00 <br />0 <br />0 <br />Site -Generated Trips [veh/h] <br />40.00 <br />Grade [%] <br />0 <br />0.00 <br />0 <br />0.00 <br />0 <br />0.00 <br />0 <br />6 <br />0.00 <br />Crosswalk <br />Diverted Trips [veh/h] <br />Yes <br />0 <br />Yes <br />0 <br />Yes <br />0 <br />0 <br />Yes <br />volumes <br />Name <br />Zane Ave <br />Line Ave <br />Main St <br />181 st Ave <br />Base Volume Input [veh/h] <br />84 <br />19 <br />18 <br />29 <br />26 <br />326 <br />113 <br />381 <br />144 <br />16 <br />467 <br />30 <br />Base Volume Adjustment Factor <br />1.0000 <br />1 1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />Heavy Vehicles Percentage [%] <br />3.00 <br />3.00 <br />3.00 <br />3.00 <br />3.00 <br />3.00 <br />3.00 <br />4.00 <br />3.00 <br />3.00 <br />4.00 <br />3.00 <br />Growth Rate <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />In -Process Volume [veh/h] <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Site -Generated Trips [veh/h] <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />6 <br />0 <br />0 <br />Diverted Trips [veh/h] <br />TT <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />_77-6 <br />0 <br />Pass -by Trips [veh/h] <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Existing Site Adjustment Volume [veh/h] <br />0 <br />-14 <br />14 <br />44 <br />-21 <br />-278 <br />86 <br />86 <br />0 <br />21 <br />278 <br />126 <br />Other Volume [veh/h] <br />0 <br />0 <br />0 <br />0 <br />0 <br />5 <br />1 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Right -Turn on Red Volume [veh/h] <br />0 <br />0 <br />0 <br />0 <br />Total Hourly Volume [veh/h] <br />84 <br />5 <br />32 <br />73 <br />5 <br />53 <br />28 <br />467 <br />144 <br />37 <br />745 <br />156 <br />Peak Hour Factor <br />0.8700 <br />0.8700 <br />0.8700 <br />0.8700 <br />0.8700 <br />0.8700 <br />0.8700 <br />0.8700 <br />0.8700 <br />0.8700 <br />0.8700 <br />0.8700 <br />Other Adjustment Factor <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />Total 15 -Minute Volume [veh/h] <br />24 <br />1 <br />9 <br />21 <br />1 <br />15 <br />8 <br />134 <br />41 <br />11 <br />214 <br />45 <br />Total Analysis Volume [veh/h] <br />97 <br />6 1 <br />37 <br />84 <br />6 <br />61 <br />32 <br />1 537 <br />166 <br />43 <br />856 <br />179 <br />Presence of On -Street Parking <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />On -Street Parking Maneuver Rate [/h] <br />Local Bus Stopping Rate [/h] <br />0 <br />0 <br />0 <br />0 <br />Pedestrian Volume [ped/h] <br />10 <br />0 <br />0 <br />0 <br />Bicycle Volume [bicycles/h] <br />10 <br />0 <br />0 <br />0 <br />Line Avenue Operations <br />Scenario 5: 5: AM - Alt A <br />Traffic Impact Study D44 Line Avenue Operations <br />