Laserfiche WebLink
Project: Wastewater Treatment Facility Improvements 2014 Owner: City of Elk River <br />Coniractor: Rice Lake Construction Group <br />Enaineer: Bolton & Menk, Inc. <br />Application Number 19 <br />Date of application 6131/2016 <br />Work completed through: 513112016 <br />Pay Item <br />Number <br />Item <br />Description <br />B <br />Scheduled Value <br />C <br />From Previous <br />Application (C+D) <br />D E Total Completed <br />This Period Materials Presently and Stored to Date <br />Stared (not in Col D) (C + D + E) <br />% <br />(� <br />Balance to <br />Finish <br />01001 <br />Performance Bond <br />$230,186.00 <br />$230,186.00 <br />5230,186.00 <br />100.00 <br />$0.00 <br />01002 <br />Insurance <br />$161,171.00 <br />$161,171.00 <br />$161,171.00 <br />100.00 <br />$0.00 <br />01003 <br />01004 <br />Mobilization <br />Demobilization <br />$635,41B.001 <br />$30,000.00 <br />$635,418.00 <br />$0.00 <br />$635,418,00 <br />$0.00 <br />100-001 <br />0,001 <br />$0.00 <br />$30,000.00 <br />01005 <br />Project Allowances <br />$540,367.04 <br />$0.00 <br />$0.00 <br />0.00 <br />$540,367.04 <br />01005.1 <br />01005.2 <br />Submittal Exchange <br />Building Permit <br />$9,795.00 <br />$29,530.04 <br />$9,795.00 <br />$29,530,04 <br />$9,795.00 <br />$29,530.04 <br />100,00 1$0.00 <br />100.00 <br />$0,00 <br />01005.3 <br />Lift Station SCADA System Allowance <br />$230,000.00 <br />$242,268.59 <br />$242,268.59 <br />105.33 <br />($12,288.59) <br />01005.4 <br />COP#01 - Automatic Door Operators <br />$5,963.20 <br />$5,963.20 <br />$5,963.20 <br />100.00 <br />$0.00 <br />01005.5 <br />COP#02 - Overflow for Biosclids Holding Tank <br />$2,787.42 <br />$2,787.42 <br />$2,787.42 <br />100.00 <br />$0.00 <br />01005.6 <br />COP403 - Additional Window in Door 1126 <br />$323.84 <br />$323.84 <br />$323.84 <br />100.00 <br />$0.00 <br />01005.7 <br />COP#04 - Delay Costs <br />IN C01 BELOW <br />01005.8 <br />COP905 - Revised Plans <br />$49,5109.90 <br />$0.00 <br />$15,204.99 $15,204.99 <br />30.71 <br />$34,304.91 <br />01005.9 <br />01005.10 <br />COP#06 - Black Material <br />COP#07 - Slide Gate 16 <br />$106,703.90 <br />$5,361.91 <br />$106,703.90 <br />$5,361.91 <br />$106,703.90 <br />$5,361.91 <br />100.00 <br />100.00 <br />$0.00 <br />$0.00 <br />01005.11 <br />COP#08 - Aeration Basin Sumps <br />$10,693.54 <br />$10,693.54 <br />$10,693.54 <br />100.00 <br />$0.00 <br />01005.12 <br />COP409 - Biosolids OH Doors <br />$37,350.46 <br />$37,350.46 <br />$37,350.46 <br />100.00 <br />$0.00 <br />01005.13 <br />01005.14 <br />OOP#10- Aeration Pipe Drop Legs <br />OOP#11 - Viton Gaskets <br />($3,500,80) <br />$11,424.54 <br />($3,500.80) <br />$11,424.54 <br />($3,500.80) <br />$11,424.54 <br />100.00 <br />100.00 <br />$0.00 <br />$0.130 <br />01005.15 <br />01005.16 <br />COP#12 - Supernatant MH Vent <br />COP#13 - Disinfection Channel Gate <br />$3,686.92 <br />($1,500.00) <br />$3,686.92 <br />($1,500.00) <br />$3,686.92 <br />($1,500.00) <br />100.00 <br />100.00 <br />$0.00 <br />$0.00 <br />01005.17 <br />01005.18 <br />01005.19 <br />01005.20 <br />01005.21 <br />01005.22 <br />COP#14 - Washer/Dryer Hookups <br />COP#15 - Dumpster Rails <br />COP#16 - Retaining Wali <br />COP#17 - Additional Hydrant & Paving <br />COP#18 - Meter Manhole <br />COP#19 - LS Stairs <br />$3,515.73 <br />$20,796.71 <br />$10,236.72 <br />$10,437.29 <br />$17,695-94 <br />($9,420.00) <br />$0.00 <br />$20,796.71 <br />$10,236.72 <br />$0.00 <br />$17,695.94 <br />($9,420.00) <br />$0.00 <br />$20,796.71 <br />$10,236.72 <br />$0,00 <br />$17,695.94 <br />($9,42000) <br />0.00 <br />100.00 <br />0.00 <br />0.00 <br />100.00 <br />100.00 <br />$3,515.73 <br />$0.010 <br />$0.00 <br />$10,437,29 <br />$0.00 <br />$0.00 <br />01005.23 <br />COP#20 - Yard Hydrants <br />$6,169.00 <br />$6,169.00 <br />$6,169.00 <br />100.00 <br />$0.00 <br />01005.24 <br />CDP#21 - Seal Fail Modules <br />$5,125.94 <br />$5,125.94 <br />$5,125-94 <br />100.00 <br />$0.00 <br />01005.25 <br />COP#22-Sand Filter Roof <br />$1,802.00 <br />$1,802.00 <br />$1,802.00 <br />100.00 <br />$0.00 <br />01005.26 <br />COP#23-Aeration Basin Lights <br />$4,167.00 <br />$4,167.00 <br />$4,167.00 <br />100.00 <br />$0.00 <br />0100527 <br />COP#24 - Lockers <br />$0.00 <br />$0.00 <br />$0.00 #DIV101 <br />$0.00 <br />01005.28 <br />OP#25 - Parapet at RASIWAS Bldg <br />$861.00 <br />$861.00 <br />$861.00 <br />100.00 <br />$0.00 <br />01005.29 <br />COP#26 - Field Order 19 <br />$4,996.90 <br />$4,996.90 <br />$4,996.90 <br />100.00 <br />$0.00 <br />Page 2 of 7 <br />