My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.0. PRSR 06-08-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2011-2020
>
2016
>
06-08-2016
>
7.0. PRSR 06-08-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2016 9:00:10 AM
Creation date
6/7/2016 9:00:10 AM
Metadata
Fields
Template:
City Government
type
PRSR
date
6/8/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hillside Park Volunteers <br /> Parks staff met with new Hillside Park volunteers. One of the volunteers, Graydon Betts,is the <br /> MORC Board Treasurer and an Elk River resident who along with Harriet Holasek has agreed in the <br /> short term to take on some of the volunteer leadership at Hillside. Harriet and her husband <br /> approached staff several weeks ago volunteering their family to adopt Hillside. She will now co-lead <br /> with Graydon. They plan to begin with an assessment of Hillside on Monday and have designed <br /> Mondays for a weekly"get together" trail work day for the volunteers. This is in addition to the <br /> work they can do at the park on a daily basis. <br /> Skate Park <br /> The second series of design workshops for the Orono Park skate park project were held on <br /> Thursday,June 2. To encourage attendance by potential users of the park,the first workshop <br /> meeting was held at the Elk River High School right after school let out, and the second meeting <br /> was held in the evening at City Hall. Overall we had 14 participants between the two workshops. <br /> Spohn Ranch, the firm hired to provide the design services,presented the design draft which was <br /> produced from feedback provided at the first workshop meeting and the Facebook page created for <br /> the project. Overall both meetings were very positive with a high level of engagement and interest <br /> from the participants. <br /> Spohn Ranch will now update the designs and produce a cost estimate and construction documents. <br /> It is anticipated that the design will be presented to the Parks and Recreation Commission at the <br /> August meeting and then the City Council shortly after. <br /> N:\Departments\Parks and Recreation\Commission\Packets\2016\06-08-16 PRC Packet\Director's Report 6-8-16.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.