Laserfiche WebLink
<br />I <br />. <br />. <br />I <br />. <br />I <br />. <br />I <br />I <br />. <br />I <br />I <br />I <br />J <br />. <br />J <br /> <br />Elk River Municipal Liquor Store <br />Elk River, MN <br />October 6, 2004 <br /> <br />Construction Budget Breakdown <br /> <br />Descriution <br /> <br />Building construction: Direct Costs <br />Coolers (20 doors @ $2800.00 / door) <br />Display shelving <br />Point of Sale fixtures <br />General Conditions <br /> <br />Sub-Total: <br />Signage Allowance: <br /> <br />Sub-Total Construction Costs: <br />Construction Management Fee: 5% (.05 x $1,511,000.00) <br /> <br />Ii <br /> <br />Total Construction Costs: <br /> <br />I) <br />I <br />.. <br />.. <br />.. <br />.. <br />.. <br />.. <br />.. <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Amount <br /> <br />$1,223,905.00 <br />$56,000.00 <br />$75,000.00 <br />$45,000.00 <br />$86.oQ<=;.00 <br /> <br />$1,486,000.00 <br />$2<=;.000.00 <br /> <br />$1,511,000.00 <br />$7<=;,<=;<=;0.00 <br /> <br />$1,586,550.00 <br /> <br />Note: Budget does not include security system, computers / check-out equipment, basement <br />or conveyors / elevators. <br /> <br />Design fees and contingency are not included <br /> <br />GREY~NECONSTRUCTIONCOMPANY <br />ELK RIvER LIQUOR STORE <br />4 <br />