Laserfiche WebLink
Page 4 <br />submitted and the City ordinance at the time of <br />reclamation. Additional measure as determined by city <br />staff may be required. <br />(10) Traffic <br />a. Except for localized jobs, traffic through Elk River <br />associated with the Operation shall be limited to U.S. <br />Highway 10 and 169. The Operator will route traffic from <br />the Operation to 221st Ave NW and Highway 169 as <br />directed by the Minnesota Department of Transportation <br />or the City of Elly River. <br />(11) Dust Control <br />a. A permit from MPGA regarding air emissions shall be <br />obtained when required and particulate emission <br />standards shall be met by the Operation. This permit and <br />all other correspondence between the Operator and MPGA <br />shall be copied to the City. <br />b, All equipment shall be located as to reduce dust to <br />adjacent properties. <br />C. A water truck shall be on site at all times when mining <br />activities are taking place to control dust as necessary. <br />Chemicals shall not be use for dust control. <br />d. The City reserves the right to require additional <br />measures to be taken, if warranted by dust problems, <br />including but not limited to reducing stock pile heights. <br />(12) Hours of Operation <br />The operator will be allowed to mine, process and sell product on <br />the site from 6:00 a.m. until 2,00 a.m. and maintain equipment <br />24 hours a day, as long as the Operation does not constitute a <br />nuisance to surrounding properties as determined by city staff. <br />If complaints can not be resolved, the Environmental <br />Administrator may, as a remedy, adjust the hours during which <br />mineral excavation activities are conducted, ultimately <br />reverting back to the normal hours of 7:00 a.m. to 7:00 p.m., <br />Monday through Saturday, Upon approval of the <br />Environmental Administrator, or his/her designee, sale (hauling <br />product off site) may occur outside of the permitted hours (on a <br />temporary basis not to exceed seven (7) days) to address an <br />s:\planning\case files\2006\cup\cu 06-04 midwest asphalt\gravcup-midwest.doc <br />