Laserfiche WebLink
Mn/DOT Contract No: 1000938 <br />plans and specifications for the work to be done must be submitted to and approved by the State, prior to <br />starting work. <br />1.5.. <br />ExhibitsExhibitA“Location Prints” and Exhibit B “Cost Estimate” are attached and incorporated into this <br />Agreement. <br />2.Right-of-WayUse <br />2.1. <br />State Access; Suspension of Work; Remedial Measures.The State's Rail Administrative Representative <br />retains the right to enter State’s right-of-way and inspect the installation of the four-quadrant signalsystems <br />at any time and without notice to the Cityor BNSF Railway. If the State determines (in its sole discretion) <br />that the construction is not being performed in a proper or timely manner, or that environmental laws (or the <br />terms of permits) are not being complied with, or that traffic control or other necessary safety measures are <br />not being properly implemented, then the State may direct the Cityand BNSF Railwayto take such <br />remedial measures as the State deems necessary. The State may require the Cityand BNSF Railwayto <br />suspend their operations until suitable remedial action plans are approved and implemented. The State will <br />have no liability to the Cityand BNSF Railwayfor exercising its rights under this provision. <br />2.2. <br />Traffic Control; Worker Safety.While the Cityand BNSF Railwayare occupying the Stateright-of-way, <br />they must comply with the approved traffic control plan, and with applicable provisions of the Work Zone <br />Field Handbook (http://www.dot.state.mn.us/trafficeng/workzone/index.html). AllCityand BNSF Railway <br />personnel occupying the State's right-of-waymust be provided with required reflective clothing and hats. <br />2.3. <br />State Ownership of Improvements.The four-quadrant signal systemsprovided for in this Agreement arethe <br />property of the State and must not be removed unless there has been a determination by the State that the <br />four-quadrant signal systems areno longer required at theselocations.If the signal system is to be removed, <br />BNSF Railwaymust notify the State of its pending removal. Upon request of the State, the BNSF Railway <br />will reinstall the signal system at some other crossing within the State on the BNSF Railway’stracks or <br />return the signal system to a location designated by the State. The location and division of cost of such <br />relocation will be agreed upon between the BNSF Railwayand the State prior to such removal.The State <br />will not be liable to the City for exercising its right under this clause. <br />3.Construction <br />3.1. <br />Direction, Supervision and Inspection of Construction <br />A. <br />The contract construction willbe under the direction of the Cityand under the supervision of a registered <br />professional engineer; however, the Stateparticipation constructioncovered under this Agreement will <br />be open to inspection by the State Rail Administrative Representative. <br />3.2. <br />Plan Changes. The State will not participate in the cost of any contract construction that is in addition to the <br />State participation constructioncovered under this Agreement unless the following conditions have been <br />met: <br />A. <br />The necessary State funds have been encumbered. <br />B. <br />All changes in the Project Plansand all addenda, change orders and supplemental agreements entered <br />into by the Cityand BNSF Railwayfor State participationconstruction are approvedin writing by the <br />State Rail Administrative Office. <br />3.3 <br />Compliance with Laws, Ordinances, Regulations.The City will comply and cause BNSF Railwayto <br />comply with all Federal, State and Local laws, and all applicable ordinances and regulations. With respect <br />only to that portion of work performed on the State's trunk highway right-of-way, the Citywill not require <br />the BNSF Railwayto follow local ordinances or to obtain local permits. <br />4.Basis of State Cost <br />4.1. <br />State Participation Construction.The State will pay 100% of the actual cost to install the four–quadrant <br />gate systems including any engineering costs,as detailed in Exhibit B. <br />-2- <br />Payable Standard (Municipal Agreements) <br />