Laserfiche WebLink
Project: Wastewater Treatment Facility Improvements 2014 <br />Contractor: Rice Lake Construction Group <br />Engineer: Bolton & Menk, Inc. <br />Owner: City of Elk River <br />Application Number <br />16 <br />Date of application <br />4/29/2016 <br />Work completed through: <br />4/29/2016 <br />Item <br />Pay Item Number Description <br />B <br />Scheduled Value <br />C I <br />From Previous <br />Application (C+D) <br />D <br />This Period <br />E <br />Materials Presently <br />Stored (not in Col D) <br />Total Completed <br />and Stored to Date <br />(C + D + E) <br />% <br />(F) <br />Balance to <br />Finish <br />15500 <br />HVAC <br />15500.1 <br />Equipment <br />$286,200.00 <br />$174,953.00 <br />$2,274.50 <br />$177,227.50 <br />61.92 <br />$108,972.50 <br />15500.2 <br />Labor <br />$169,020.00 <br />$75,175.50 <br />$5,698.50 <br />$80,874.00 <br />47.85 <br />$88,146.00 <br />15500.3 <br />Duct Insulation <br />$24,780.00 <br />$4,460.40 <br />$4,460.40 <br />18.00 <br />$20,319.60 <br />15500.4 <br />Test & Balance <br />$5,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$5,00000 <br />15950 <br />HVAC Controls <br />$67,400-00 <br />$22,000.00 <br />$10,000.00 <br />$32,000.00 <br />47.48 <br />$35,400.00 <br />16000 <br />Electrical <br />16000.1 <br />General Provisions <br />$55,000.00 <br />$40,280.00 <br />$2,400.00 <br />$42,680.00 <br />77.60 <br />$12,320.00 <br />16000.2 <br />Basic Materials and Methods <br />$265,000.00 <br />$174,220.00 <br />$6,100.00 <br />$180,320.00 <br />68.05 <br />$84,680.00 <br />16000.3 <br />Motors <br />$32,000.00 <br />$22,865.00 <br />$22,86500 <br />71.45 <br />$9,135.00 <br />16000.4 <br />Power Generation System <br />$414,000.00 <br />$414,000.00 <br />$414,000.00 <br />100,00 <br />$0.00 <br />16000.5 <br />Electrical Distribution <br />$385,000.00 <br />$369,040.00 <br />$369,040.00 <br />95,85 <br />$15,960.00 <br />16000.6 <br />Lighting <br />$85,000.00 <br />$45,450.00 <br />$45,450.00 <br />53.47 <br />$39,550.00 <br />160007 <br />Special Systems <br />$24,000,00 <br />$9,580.00 <br />$380.00 <br />$9,960.00 <br />41.50 <br />$14,040.00 <br />16000.8 <br />Starters and Motor Control <br />$330,000.00 <br />$295,800.00 <br />$600.00 <br />$296,40000 <br />89.82 <br />$33,600.00 <br />16000.9 <br />Instrumentation and Control <br />$480,000.00 <br />$415,400.00 <br />$3,150.00 <br />$418,550.00 <br />87.20 <br />$61,450.00 <br />Change Order No. 1 <br />$259,991.59 <br />$259,991.59 <br />$259,991.59 <br />100.00 <br />$0.00 <br />$16,785,191.559 <br />$13,482,545.47 <br />$181,103.00 <br />$0.00 <br />$13,663,648.47 <br />81.40 <br />$3,121,543.12 <br />EJCDC No. C-620 (2002 Edition) <br />Prepared by the Engineers' Joint Contract Documents Committee and endorsed by the Associated General Contractors of America and the Construction Specifications Institute. <br />Page 7 of 7 <br />