Laserfiche WebLink
Project: Wastewater Treatment Facility Improvements 2014 Owner City of Elk River Application Number 18 <br />Contractor: Rice Lake Construction Group Date of application 4/2912016 <br />Engineer: Bolton & Menk, Inc. Work completed through: 412912016 <br />Item <br />Pay Item Number Description <br />B <br />Scheduled Value <br />C D <br />From Previous This Period <br />Application (C+D) <br />E Total Completed <br />Materiats Presently and Stored to Date <br />Stored (not in Cal D) (C + D + E) <br />% <br />(F) <br />Balance to <br />Finish <br />01001 <br />Performance Bond <br />$230,186.00 <br />$230,186.00 <br />$230,186.00 <br />100.00 <br />$0.00 <br />01002 <br />Insurance <br />$161,171.00 <br />$161,171.00 <br />$161,171.00 <br />100.00 <br />$0.00 <br />01003 <br />Mobilization <br />$635,418.00 <br />$635,418.00 <br />$635,418-00 <br />100,001 <br />$0.00 <br />01004 <br />Demobilization <br />$30,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$30,000,00 <br />01005 <br />Project Allowances <br />$666,240.18 <br />$0.00 <br />$0.00 <br />0,00 <br />$666,240.18 <br />01005.1 <br />Submittal Exchange <br />$9,795.00 <br />$9,795.00 <br />$9,795.00 <br />100.00 <br />$0,00 <br />01005.2 <br />Building Permit <br />$29,530.04 <br />$29,530.04 <br />$29,530.04 <br />100,00 <br />$0.00 <br />01005.3 <br />Lift Station SCADA System Allowance <br />$230,000.00 <br />$242,268.59 <br />$242,268-59 <br />105.33 <br />($12,268.59) <br />01005.4 <br />COP#01 -Automatic Door Operators <br />$5,963,20 <br />$5,963.20 <br />$5,963.20 <br />100,00 <br />$0,00 <br />01005.5 <br />COP#02 - Overflow for Biosolids Holding Tank <br />$2,787.42 <br />$2,787.42 <br />$2,787.42 <br />100,00 <br />$0.00 <br />01005.6 <br />COP#03 - Additional Window in Door 1128 <br />$323.84 <br />$323.84 <br />$323.84 <br />100.00 <br />$0.00 <br />01005.7 <br />COP#04 - Delay Costs <br />IN C01 BELOW <br />01005.8 <br />COP#05 - Revised Plans <br />$0,00 <br />$0.00 <br />#DIV/01 <br />$0.00 <br />01005.9 <br />COP#06 - Black Material <br />$106,703.90 <br />$106,703.90 <br />$106,703.90 <br />100.00 <br />$0.00 <br />01005.10 <br />COP#07 - Slide Gate 16 <br />$5,361.91 <br />$5,361.91 <br />$5,361.91 <br />100.00 <br />$0.00 <br />01005.11 <br />COP#08 - Aeration Basin Sumps <br />$10,693.54 <br />$10,693.54 <br />$10,693.54 <br />100.00 <br />$0.00 <br />01005.12 <br />COP#09 - Biosolids OH Doors <br />$37,350.46 <br />$37,350.46 <br />$37,350.46 <br />100.00 <br />$0.00 <br />01005.13 <br />COP#1 0- Aeration Pipe Drop Legs <br />($3,500.80) <br />($3,500.80) <br />($3,500.80) <br />100.00 <br />$0.00 <br />01005.14 <br />C0P#11 - Viton Gaskets <br />$11,424.54 <br />$11,424,54 <br />$11,424.54 <br />100.00 <br />$000, <br />01005.15 <br />COP#12 - Supernatant MH Vent <br />$3,686.92 <br />$3,886.92 <br />$3,686.92 <br />100.00 <br />$0.00 <br />01005.16 <br />C0P#13 - Disinfection Channel Gate <br />($1,50000) <br />($1,500.00) <br />($1,500.00) <br />100.00 <br />$0.00 <br />01005.17 <br />COP#14 - Washer/Dryer Hookups <br />$3,515.73 <br />$0.00 <br />$0.00 <br />0.00 <br />$3,515.73 <br />01005,18 <br />C0P#15 - Dumpstar Rails <br />$20,796.71 <br />$20,796.71 <br />$20,796.71 <br />100.00 <br />$0.00 <br />01005.19 <br />COP#16 - Retaining Wall <br />$10,236.72 <br />$10,236.72 <br />$10,236.72 <br />0.00 <br />$0.00 <br />01005.20 <br />COP#17 - Additional Hydrant & Paving <br />$10,437.29 <br />$0.00 <br />$0.00 <br />0.00 <br />$10,437.29 <br />01005.21 <br />COP#1 a - Meter Manhole <br />$17,695.94 <br />$17,695.94 <br />$17,695.94 <br />100.00 <br />$0.00 <br />01005.22 <br />COP#19 - LS Stairs <br />($9,420.00) <br />($9,420.00) <br />($9,420.00) <br />100.00 <br />$0.00 <br />01005.23 <br />COP#20 - Yard Hydrants <br />$6,169.00 <br />$6,169.00 <br />$6,169.00 <br />100.00 <br />$0.00 <br />01005.24 <br />COP#21 -Seal Fail Modules <br />$5,125.94 <br />$5,125.94 <br />$5,125.94 <br />100.00 <br />$0,00 <br />01005.25 <br />COP#22 - Sand Filter Roof <br />$1,802.00 <br />$1,802.00 <br />$1,802.00 <br />100.00 <br />$0,00 <br />01005.26 <br />COP#23 - Aeration Basin Lights <br />$4,167.00 <br />$4,16700 <br />$4,167.00 <br />100.00 <br />$0.00 <br />01005.27 <br />COP#24 - Lockers <br />$0.00 <br />$0.00 <br />$0.00 #DIV101 <br />$0.00 <br />01005.28 <br />COP#25 - Parapet at RAS1VVAS Bldg <br />$861.00 <br />$861.00 <br />$861.00 <br />100.00 <br />$0.00 <br />Page 2 of 7 <br />