My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.6. ERMUSR 05-10-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2016
>
05-10-2016
>
2.6. ERMUSR 05-10-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2016 9:18:23 AM
Creation date
5/10/2016 9:18:22 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/10/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELK RIVER MUNICIPAL UTILITIES <br /> Energy Management Rates <br /> Available:Within Elk River Municipal Utilities(ERMU)established service territory. <br /> Applicable:To single family residences, non-demand and demand customers receiving service <br /> under another rate,who add a second meter for any of the following controlled loads: <br /> Dual Fuel Space Heating Rate: This Program is available to residential customers only. A <br /> dual fuel space heating system consists of an electric heating system and a secondary non- <br /> electric space heating system both capable of heating the living space at design conditions. <br /> Interruptions of the electric heating system will usually occur for up to 12 hours daily on peak <br /> winter days and a maximum of 400 hours per heating season. <br /> To qualify for the special rate,the customer shall provide: <br /> 1. An electric space heating system which can be interrupted by a single 5 amp rated relay. <br /> 2. A secondary non-electric space heating system capable of automatic start-up and <br /> continuous operation upon interruption of the electric heating system. <br /> 3. Obtain a load control device furnished by ERMU. <br /> 4. Accommodations for a meter and load control device and associated wiring installed <br /> according to the applicable electrical codes,and installed by a qualified electrician. <br /> 5. Inspection by a State certified electrical inspector and a representative of ERMU. <br /> 6. Radiant heat in the slab of the building qualifies for dual fuel, not electric thermal storage. <br /> 7. Dual Fuel is not allowed in garages, pole sheds,or any structure that does not confirm to <br /> the residential building code. <br /> 8. Exceptions by management approval only. <br /> Elk River Municipal Utilities shall provide: <br /> 1. All electric energy consumed by the primary electric heating system at$.0585 per kWh. <br /> 2. The rate is subject to application of the Power Cost Adjustment(PCA). <br /> 3. During peak load conditions, ERMU will turn customer controlled electrical heat off for <br /> extended periods of time as stated above. <br /> 4. A meter to measure electricity consumed by the electric heating system. <br /> 5. A load control device and meter socket to accommodate the meter. <br /> Electric Vehicle Charging Rate:This Program is available to all customers of ERMU that own <br /> an electrically powered vehicle used for on road transportation. Charging of the vehicle will <br /> occur in the eight off-peak hours daily. Off peak hours typically occur between 11 p.m.and 7 <br /> a.m. Customers could install 120 volt charging equipment but the Electric Vehicle Charging <br /> Rate would not be applicable. <br /> To qualify for the special rate,the customer shall provide: <br /> 1. Electric vehicle charging station that is used for the sole purpose of charging electric <br /> vehicles. This charging station must be 240 volt. <br /> 2. Customer is responsible for installation of load control device and meter socket+s <br /> furnished by ERMUI in a mutually agreed upon location. <br /> 116 <br />
The URL can be used to link to this page
Your browser does not support the video tag.