Laserfiche WebLink
City Council Minutes <br />April 4, 2016 <br />Page 6 <br />3. The applicant shall, by April 4, 2017, submit a complete <br />application for all approvals required to convert the property to <br />a multi -family use allowed in the R-4 (or similar) zoning <br />district. This IUP shall expire, by its terms, if such a complete <br />application is not received by April 4, 2017. <br />4. The applicant shall, by April 4, 2019, complete all improvements <br />necessary to use the property for a use allowed in the zoning <br />district and shall have been issued a certificate of occupancy for <br />a use allowed in the R-4 (or similar) district by April 4, 2019. <br />5. This Interim Use Permit is good for three years and, if it is still <br />in effect on April 4, 2019, shall expire on that date without any <br />further action of the city. <br />6. The front desk shall be staffed Monday through Friday from <br />9am to 4pm. <br />7. Outside storage is not permitted. <br />8. The Interim Use Permit is not a building permit and the <br />applicant must apply for and receive approval of required <br />building and sign permits before any construction may begin. <br />9. The property shall meet all current fire, building, and <br />international property maintenance codes. <br />10. The property must be licensed by all appropriate state and local <br />agencies for the duration of the Interim Use Permit. <br />This Interim Use Permit shall also expire, without any further <br />action by the city, if the use authorized here in ceases for more <br />than six months. <br />Motion carried 5-0. <br />8.3. Quiet Zone Project Update and Plan Approval <br />Mr. Femtite presented the staff report. He requested direction from the council on <br />installing supplemental safety measures (SSMs) at County State Aid Highway <br />(CSAR) 1 or continuing with the previous option of installing wayside homs. The <br />options presented for SSMs at this intersection included installation of a 4 -quad gate <br />system or the widening of the roadway and construction of a raised median. Mr. <br />Femrite indicated he had a positive meeting with the property owners who would be <br />most affected if widening the roadway and constructing raised medians were to be <br />selected. He requested property assessed values from the county and should receive <br />those later in the week and would contact the other affected property owners. <br />Mayor Dietz asked if the county wanted to make improvements this year and if so <br />was there an urgency to get this completed. <br />Mr. Femrite indicated the modifications of this roadway, which would include road <br />widening work and resurfacing, were estimated to be completed by 2018. He <br />discussed the Highway 10 bridge project taking place in 2017, which will add <br />additional construction traffic in this area. He stated based upon the work already <br />{A <br />P 00�1E I I I 1 1 <br />\ <br />1 ATURE <br />