Laserfiche WebLink
PAXMA R© <br /> approximate 110 foot wide corridor after planning for back yards on lots either side. <br /> From a 960 high point to a 920 elevation at the wetland to the east, a great sledding <br /> hill exists. As this corridor approached the wetlands to the Southeast, it widens to <br /> provide an opportunity for a trail network to surround that 15-acre complex. In the <br /> current submittal,this trail corridor provides 6.8 acres of new open space. This is <br /> about 7% of the project total. <br /> We would propose to grade, respread topsoil and seed to the park grade seed type <br /> chosen. <br /> C. Future Connections <br /> To the east,park trails would continue through the wetland complex of the KR <br /> Farmland parcel to County road 40 so that by the time all parcels are completed, a <br /> complete loop of paved trail could be used to circulate around all dedicated lands and <br /> to other parts of the city. If there is a delay for an off road trail along County 40 <br /> south of River Park,then inside River Park we project the following system would be <br /> complete: <br /> 1.4 miles of trails <br /> Sidewalks on one side of all streets, about 2 miles <br /> Existing parks and sidewalks previously built <br /> Future 3/4 mile sidewalks on Lennar portion of Ivanhoe drive to be completed by <br /> others <br /> The Lennar masterplan created additional neighborhood park space connected to our <br /> parcel at the south end of the project plans. The powerline corridor creates an added <br /> expansion potential through their land to Ivanhoe Street and potentially to the west. <br /> VI. TRAFFIC REVIEW <br /> The City previously reviewed all traffic impacts and concluded there were no required <br /> perimeter improvements other than what was started in the upgrade to County 40 and the <br /> dedication of additional right of way with the first phase plats. The trip generation of the <br /> planned lots in Miske Meadows is consistent with the previous EAW findings. We will <br /> provide the necessary turn lanes for new project entrances as a condition of project <br /> expansion, when the warrants are met. <br /> We will require new construction machinery traffic, as feasible, to use the proposed new <br /> road access points shown off of County 40. Once built, we expect most of the <br /> construction building traffic to use the new entrance points. Future phases west of <br /> Ivanhoe will use the existing road network as laid out. <br /> 5160 Viking Blvd.NW <br /> Anoka, MN <br /> (763)753-6176 <br />