My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3 PCSR 04-26-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2016
>
04-26-2016
>
6.3 PCSR 04-26-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2016 2:35:26 PM
Creation date
4/21/2016 2:34:20 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
4/26/2016
case
CU 16-10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 6 <br /> governmental entities. The Operator shall adhere to <br /> these plans in the event there is a spill. <br /> b. The Operator shall provide the Fire Department with a <br /> copy of their flammable or hazardous materials. <br /> c. Fuel tanks shall be above ground, properly diked (if <br /> required by law), and registered with MPCA. <br /> d, All incidences that have the potential to adversely affect <br /> groundwater, including but not limited to spills, shall be <br /> verbally reported to the City within 24 hours. This verbal <br /> notification shall be followed up in writing within four (4) <br /> working days. <br /> e. The appropriate storm water permits (NPDES) shall be <br /> obtained by the Operator from MPCA and copied to the <br /> City. <br /> f. The wells located at the site shall be monitored once a <br /> year for diesel range organics (DRO). Mining activities <br /> shall not take place closer to ground water levels than <br /> indicated in the plans submitted without amending this <br /> conditional use permit; however, if mining is proposed to <br /> occur below the water table in the future, the above <br /> referenced wells shall be monitored for DRO prior to <br /> excavation activities commencing and after their <br /> cessation each year. Further, in the event of a spill, <br /> appropriate water tests (as determined by the city) will be <br /> taken until the spill is deemed clean by the city. <br /> g. Except for minor repairs, maintenance of vehicles and <br /> equipment shall take place in the Operator's shop. The <br /> Operator shall have an approved hazardous waste license <br /> for this facility and properly dispose of all waste. <br /> h. A minimum of a two-celled system to recycle water from <br /> the wash operation shall be utilized. <br /> Each year, groundwater levels shall be monitored prior to <br /> start of wash operations and an additional three (3) times <br /> during the first week of said operation to predict the long <br /> term effects of the pump operation. Thereafter, the <br /> aforementioned well shall be tested a minimum of twice <br /> per month, said frequency to be increased during dry <br /> s:\planning\case files\2006\cup\cu 06-04 midwest asphalt\gravcucp-midweet.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.