My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3 PCSR 04-26-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2016
>
04-26-2016
>
6.3 PCSR 04-26-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2016 2:35:26 PM
Creation date
4/21/2016 2:34:20 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
4/26/2016
case
CU 16-10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 <br /> writing within four (4) working days of the violation. The <br /> Operator shall notify the City annually in writing of the total <br /> area and amount of material mined and projected estimates of <br /> area and amount of material to be mined in the following year. <br /> This is to be done at time of license renewal. <br /> (04) The license shall be renewed annually and shall run from June <br /> let through May 31st. The annual license fee is that which is <br /> specified by the Elk River City Council at time of renewal. This <br /> license fee is not in lieu of gravel tax collected by the County, a <br /> portion of which the City receives. <br /> (05) Violations of this Conditional Use Permit may result in <br /> suspension or revocation. <br /> (06) The City Environmental Administrator and/or his/her agents <br /> shall be permitted to inspect the Operation for compliance with <br /> the conditions of this permit during normal hours of operation. <br /> (07) The City's approval of this Conditional Use Permit is subject to <br /> the approval of appropriate permits by other governmental <br /> agencies. <br /> (08) No explosives shall be allowed for this operation. <br /> (09) Reclamation <br /> a. Reclamation shall be implemented on an annual basis <br /> pursuant to the reclamation plans submitted by the <br /> Operator. <br /> b. Each year a plan for that year's reclamation shall be <br /> approved by the Environmental Administrator prior to <br /> issuance of the mineral excavation license. <br /> c. The reclamation shall include topsoil from the site being <br /> preserved and put back into place after mining. <br /> d. Revegetation of the property shall include seeding with a <br /> mixture approved by city staff accompanied by a nurse <br /> crop or approved mulch. The vegetation established for <br /> the reclamation must be maintained until it is self- <br /> sufficient. <br /> e. Contours, finished grades, details of erosion control <br /> methods, and settling ponds, shall comply with the plans <br /> s:\planning\caee files\2006\cup\cu 06-04 midwest aephalt\gravcup-midwest.doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.