Laserfiche WebLink
11. Reclamation Plan: <br /> Overburden&Topsoil that was removed from the mining extraction and placed in <br /> earth berms will be used in reclamation plan as well as the excess fines. <br /> The reclaimed pit slopes shall be not more than One(1) foot vertical to Four(4) <br /> foot horizontal. Excess fines and overburden will be used for sloping and leveling. A <br /> minimum of three inches of topsoil will be placed and graded to the depleted areas and <br /> seeded. <br />