My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3 PCSR 04-26-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2016
>
04-26-2016
>
6.3 PCSR 04-26-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2016 2:35:26 PM
Creation date
4/21/2016 2:34:20 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
4/26/2016
case
CU 16-10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Nine(9)Best Management Practices (BMP's)were incorporated into the plan <br /> that encompass the operation of rock and gravel crushing and processing plants,and <br /> areas adjacent to the plants that may be impacted by the operations. They are: <br /> I. Education - Eliminate human error as a factor in pollution prevention <br /> II. Inspection and supervision <br /> III. Communication and supervision <br /> TV. Selection of plant sites based on environmental factors <br /> V. Proper storage of petroleum products-eliminate exposure to storm water. <br /> VI. Perform routine and repair maintenance as needed to eliminate leakage from <br /> mechanical components. <br /> VII. Use available resources to contain common spills. <br /> VIII. Construct bermed containment areas when needed to fulfill intent and purpose of the <br /> plan. <br /> TX. Erosion control prevention <br /> The practices listed have been expanded in the plant to address specific areas of <br /> concern.Plant operators or supervisors have the option to expand or adapt particular <br /> practices to best serve the intent of the plan at a specific site. <br /> STROM WATER POLLUTION PREVENTION PLAN <br /> IMPLEMENTATION OF BEST MANGAMENT PRACTICES(BMP's) <br /> 1. Education <br /> a. The storm water pollution prevention plan is reviewed at the January production <br /> meeting. The intent of the plan is stressed,and changes or improvements are noted. The <br /> plan is discussed and ideas are exchanged for plan improvement. Any new ideas that <br /> contribute to the intent of the plan are included in the written storm water pollution <br /> prevention plan. <br /> b. Midwest Asphalt Corporation holds employee spill training before beginning seasonal <br /> operation to instruct all plant personnel in safe petroleum product handling,proper <br /> maintenance procedures,and routine inspection of the plant during operation.Personnel <br /> are encouraged to take a pro-active role in prevention of spills. Good housekeeping <br /> practices are stressed for the control of minor drips and leaks from daily maintenance <br /> and operation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.