My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3 PCSR 04-26-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2016
>
04-26-2016
>
6.3 PCSR 04-26-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2016 2:35:26 PM
Creation date
4/21/2016 2:34:20 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
4/26/2016
case
CU 16-10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Estimated Daily Truck Traffic& Traffic Route: <br /> Estimated Average daily number of vehicles accessing the facility: <br /> 40 <br /> Estimated peak daily number of vehicles accessing the facility: <br /> 210 <br /> Estimated operator-owned vehicles: <br /> 1/3 of vehicles could be operator-owned <br /> Estimated non-operator owned vehicles: <br /> 2/3 of vehicles could be non-operator-owned <br /> Traffic Route: <br /> Material removed from the excavation site shall be transported within the city <br /> exclusively upon the following haul route: 221'Ave. east to Highway 169 <br /> (Except for localized jobs or customers with localized jobs) <br />
The URL can be used to link to this page
Your browser does not support the video tag.