My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORD 16-08
ElkRiver
>
City Government
>
City Council
>
Council Ordinances
>
2010 - 2019
>
2016
>
ORD 16-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2016 8:01:10 AM
Creation date
4/20/2016 3:01:48 PM
Metadata
Fields
Template:
City Government
type
ORD
date
4/18/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to be rernowd <br />L)nderline-, to be added <br />(3) C'overage. <br />,a. All solar ener r r systeins shall complr with Minn. Stats. X1305.3113. <br />b. For all applications, 17"ire Departmet-it review is re!4uired. <br />(4) Glair. Solar systenis shall be deli ed and located in order to prevent reflective gfare <br />toward any inhabited buildings on adjacent properties, as well as adjacent street right -of- <br />ways and parks to the fullest possible extent. When necessav�, screening ma be required <br />to prevent glare. <br />a. Cwicenli-eiled SolarSEsLtivs shall conduct a glare study to identif <br />y the impacts of the <br />System on occupied buildings and fights -of -way and 12arks within a half -mile of the <br />Vroject boundaLy. The glare study shall also, address aviation Impacts. <br />(5) Exem, lion, Building integrated solar energy systems are exempt ftoin the requirements <br />,of this section and shall be regulated bythe building ;cycle... <br />(c) Pemfils sand .NoLiLicaliom <br />(1) Penwils. The erection alteration improvement, reconstruction, aiad relocation of a <br />solar enerU system requires a building perinit fromthe cit,, <br />a. A-P41kalions. An applicant for a solar systein permit shall make applicafionto the <br />Building, Department. The annfication shall accurately state <br />1. The narne and contact information of the applicant. <br />2. The name and contact information of the installer. <br />I The address of the molect being applied for.. <br />4. To -scale horizontal and vertical elevation drawings showiM. <br />a. Location of the system on the building or on the propert�, including <br />Property lines. <br />1). Any exterior devices such as but not limited to inverters electrical <br />boxes, batteries <br />L,e �tc. <br />c. For roof -ton solar: <br />L All systems shall show the distance to the roof edges, parapets, <br />ridges, roof penetrations, or changes in roof plane. <br />2, Pitched roof mounted systems shall show the highest finished slope: <br />of the solar collector and the slope of the finished roof surface c)n <br />which it is mounted. <br />C <br />Pitched Roof Flat Roof <br />typically A Shall not exceed more than 6 inches from the roof peak, <br />Shall <br />B Shad ro exceed 5'-0". <br />Is <br />Is 3'-0', Refer to Won Stars. Sec. 13053113 <br />(= <br />List Updated March 2014 <br />IN"A"L'i'U6WE <br />T - J' <br />
The URL can be used to link to this page
Your browser does not support the video tag.