My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.2B. SR 04-18-2016
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2016
>
04-18-2016
>
7.2B. SR 04-18-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2016 2:40:59 PM
Creation date
4/15/2016 2:39:26 PM
Metadata
Fields
Template:
City Government
type
SR
date
4/18/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DoOXANESO,q Minnesota Department of Transportation <br /> a District 3 <br /> Q� 7694 Industrial Park Road Office Phone: 218-828-5700 <br /> tir OF TO Baxter, MN 56425 Fax: 218-828-5814 <br /> f <br /> March 15,2016 <br /> Mr. Chris Leeseberg <br /> City of Elk River Planning <br /> 13065 Orono Parkway <br /> Elk River,MN 55330 <br /> RE: C.S. 7106;R.P. (U.S. 169) <br /> Haugland Conditional Use Permit(CUP) Site Plan <br /> Sherburne County,Minnesota <br /> Dear Mr. Leeseberg: <br /> The Minnesota Department of Transportation(MnDOT)has reviewed the above-referenced site plan <br /> and would like to offer the following comments/recommendations: <br /> 1. The site plan shows the applicant adding ten feet of pipe in MnDOT right of way. MnDOT will <br /> need to determine and inform the applicant on how much pipe is necessary prior to installation. <br /> Additionally,the current apron might not meet the new requirement,which calls for a safety <br /> apron. This may also be an opportunity to realign the driveway entrance to a 90 degree angle <br /> with U.S. Highway 169 to improve a possible site restriction. <br /> i <br /> 2. The curb and gutter will not be allowed to extend into State right of way. <br /> i <br /> 3. MnDOT will review the hydraulics of the area to ensure the applicant is not bringing more water <br /> into our drainage system, either in volume or defined directional capacity. <br /> i <br /> 4. At this time,the in-place right-turn lane will not have to be extended. However, if traffic <br /> volumes increase for the business or if traffic issues arise in the future, safety improvements <br /> deemed necessary by MnDOT's District 3 Traffic Engineer will need to be constructed at no cost <br /> to the State. <br /> 5. A permit is required to perform any work in the right of way. Contact mark Renn,District 3 <br /> Permits Supervisor, at 320/223-6522 for additional information. <br /> i <br /> If you have any further questions or comments,please call me at 218/828-5780. <br /> I <br /> Sincerely, <br /> Jon Mason <br /> Senior Planner <br /> min <br /> cc: MnDOT District 3 Entrance Group(electronic) <br /> An Equal Opportunity Employer <br /> ldr%L AML <br /> q pP Y <br /> Ar-'%IL AM EL NAM% AVAIL <br />
The URL can be used to link to this page
Your browser does not support the video tag.