Laserfiche WebLink
Below: Well #2 pressure filter <br /> Opposite: Electrical technician installing a meter <br /> Water Department <br /> In 2015 Elk River Municipal Utilities went through an extensive rehabilitation <br /> project for WeLL #2. The well was entirely rebuilt, the filter and pipes were <br /> sandblasted and painted, and the chemical feed system was rebuilt. This project <br /> will extend the life of the well and filter far into the future. In 2015 ERMU also <br /> began the WeLL #7 Water Treatment Plant Expansion design process. The addition <br /> of the filter is the final phase of a multi-year project to increase water production <br /> to cover growth and development in Natures Edge Business Park. <br /> } <br /> iliP <br /> i <br /> Mi <br /> N _ <br /> E K <br /> V <br /> NISAllimio <br /> t <br /> 2015 Water Department Statistics: <br /> • Peak = 4,400,000 gallons per day <br /> • Annual Water Sales = 676,842,000 gallons <br /> Page 9 • Number of Customers = 4,800 <br /> • Miles of Watermain = 110 miles <br />