Laserfiche WebLink
establishing a new PUD to account for the change in use and deviations from city ordinances. Deviations <br />from the ordinance include reduced setbacks, lot coverage, and parking. There are also a number of <br />concerns relating to the mild and Scenic River District Ordinance that may be addressed during the PUD <br />process, but some items will also need DNR approval. The Environmental Department has been working <br />closely with the applicant to identify potential solutions. If approved, the project may need additional <br />variances to account for work completed within the mild and Scenic River District. <br />Development in this area is guided by the Focused Area Study (FAST) and the property is split between <br />two sub -areas; existing residential along the river and service commercial along Highway 10. The <br />proposed uses are supported by the FAST and Comprehensive Plans. <br />Site Plan <br />Access to the site will be from an extension of Yale Court, connecting to 170th Ave. The extension is <br />identified in the city transportation plans and is one of the key roadway connections desired by the city. <br />The existing cul-de-sac and right-of-way are proposed to be modified to accommodate surface parking <br />north of the building, which is pushed to the west side of the parcel and as close to the bluff line as <br />possible. The proposed bluff line setback is zero feet. Due to the proximity of the parking and outdoor <br />seating areas to the bluff, additional safety features would be required. These may include additional <br />stabilization features along the bluff, fencing, bollards, etc. <br />The extension of Yale Court requires a land swap with the adjacent bank property to accommodate <br />proposed roadway geometrics. Staff has initiated this transaction and is working to finalize the process. <br />The buildable section of the parcel, after accounting for road right-of-way, is approximately 3/4 acre. <br />Landscaping <br />With such a small site, there are minimal opportunities for landscaping. However, the developer plans to <br />include a green roof and minimize impervious surface areas as much as possible. A complete landscape <br />plan has not yet been received, but if a recommendation of approval is made, a complete and updated <br />landscape plan should be a condition of approval. <br />Building <br />The entire building will be constructed with unique building materials and techniques to ensure top tier <br />efficiency and promote sustainability. The building includes five levels above and two levels of parking <br />below ground. The narrative identifies a potential for geothermal heating and cooling, solar panels above <br />street parking and on the rooftop, and numerous "smart" technologies to manage building systems. <br />Parking <br />The current plan includes a total of 195 parking spaces, with the opportunity for 24 more by adding a <br />second story to the surface lot, resulting in 219 spaces. With the current uses, the building requires 275 <br />parking spaces per city ordinance. Through the PUD process there is an opportunity to reduce the <br />number of parking spaces required, and with Council approval, allow the counting of on -street parking <br />for some of the required spaces. <br />Reducing parking requirements has been approved by the city in the past. Parking requirements for <br />residential uses at The Depot at Elk River Station and Coachman Ridge projects near the North Star <br />Station were reduced to 2.34 stalls per unit. The most recent project, Coachman Ridge, only constructed <br />2 stalls per unit, but demonstrated the ability to construct the remaining stalls if needed. This project is <br />located across the parking lot from the train station. Staff has not received any complaints from residents <br />