Laserfiche WebLink
.Kiver <br />To: Planning Department <br />Memorandum <br />From: Brandon Wisner, Stormwater Coordinator <br />Date: February 3, 2016 <br />Subject: Site Plan Review Meeting — February 1, 2016 <br />The department listed above has reviewed the application(s) listed below and has the following <br />comments: <br />Case # CU 16-04 — Cornerstone Auto Elk River <br />1. NPDES permit is needed for construction activity disturbing more than one acre. Proof of <br />the SWPPP designer's `Design of Construction SWPPP' certification. <br />2. Updated `Operation and Maintenance' document for all associated permanent stormwater <br />best management practices and an updated SWPPP sheet with all required notes. <br />3. In the approved plans from 2006, less stormwater was proposed to be sent to the larger <br />basin east of the main Cornerstone building. The basin to the east is shown to be on a <br />different property, owned by a different party. Provide necessary documentation that further <br />stormwater directed to the east basin is approved by the appropriate property owner. <br />