Laserfiche WebLink
City ordinances require a 25 foot wetland buffer strip around all delineated wetlands and ordinary <br />highwater marks for stormwater pods. No structures or alterations/maintenance to vegetation are <br />allowed in the buffer strip. There is also an additional 20 foot wetland buffer strip setback from the 25 <br />foot buffer strip, for a total structure setback of 45 feet from wetlands and stormwater ponds. <br />Recent practice has been to require a 45 foot easement around the edge of all delineated wetlands and the <br />stormwater ponds. The easement is to prevent placement of structures, including sheds and retaining <br />walls, within the required 45 foot setback. Property owners can maintain vegetation (lawn) in the 20 foot <br />wetland buffer strip setback. The property lines are proposed to stop at the 25 foot wetland buffer strip <br />to reduce the chance of disturbing those areas. <br />Engineering and Stormwater <br />Staff is comfortable with proposed changes to the overall street layout. The connection of Lincoln Street <br />between Miske Meadows and the adjacent plat is shown on the plat and would be constructed during the <br />third phase of development. The connection provides alternative routes for residents of the Sunset Ridge <br />area, improves connectivity for vehicular and pedestrian traffic, improves access for emergency vehicles, <br />improves service vehicle traffic patterns (garbage and plow vehicles), and establishes the right-of-way for <br />future utility connections. <br />The Miske Meadows project will impact traffic in the city, and the impacts were studied as part of the <br />environmental review done for River Park. The study identified a number of changes to the road network <br />beyond the development. The changes included a re -alignment of Clevelend Ave to intersect Twin Lakes <br />Road perpendicularly, pave Cleveland between Twin Lakes Road and County Road 12, and add a bypass <br />lane to County Road 12. These improvements have been completed and staff believes the previous traffic <br />study is still relevant for the current proposal. According to traffic counts sourced from MNDOT traffic <br />along Twin Lakes Road has not substantially changed since 2003. The average daily traffic counts for the <br />segment of road nearest the proposed development decreased from 5,600 to 5,400 vehicles per day. <br />The River Park plat identified a connection across Trout Brook between River Park and Twin Lakes <br />Estates. When the project was reviewed as once complete project, connections between developments, <br />county road access, and additional traffic and circulation requirements were discussed. Paxmar does not <br />currently own the land near the Trout Brook and the connection is not included in the current scope of <br />work. However, when the land is developed, the connection will be the responsibility of the developer. <br />There was some discussion regarding cost sharing between current property owners, however <br />improvements included with this development are not proposed for cost sharing and the connection <br />across Trout Brook will be the future developers' responsibility. <br />Stormwater staff have been in contact with the applicant to address remaining concerns with the drainage <br />and stormwater plans. If a recommendation of approval is made, staff approval of the drainage plans <br />should be included as a condition. <br />Parks <br />The general location of the park on the original River Park plat is not proposed to change. A portion of <br />the park is included in the current plans and the remainder will be included when the remaining property <br />owners plat. <br />N:ADepartments\Community Development\Planning\Case Files\P\P 16-02 Miske Meadows\P 16-02 SR PC 3-22-2016 Paxmar - Miskc <br />Mcadows.docx <br />