Laserfiche WebLink
4. To-scale horizontal and vertical elevation drawings showing: <br /> 1. Location of the system on the building or on the property, <br /> including property lines. <br /> 2. Any exterior devices (such as but not limited to inverters, <br /> electrical boxes,batteries, etc.) <br /> 3. For roof-top solar: <br /> a. All systems shall show the distance to the roof edges, <br /> parapets,ridges,roof penetrations, or changes in roof <br /> plane. <br /> b. Pitched roof mounted systems shall show the highest <br /> finished slope of - solar collector and the slope of <br /> the finished r' face on which it is mounted. <br /> b. Approval—Applications that meet the ements of this ordinance,and do <br /> not require a variance, shall be granted a'x qk te 44.. approval by the Building <br /> Official. Plan approval does not indi ci plianc a Building,Electric,or <br /> Plumbing Code. <br /> 2. Utility Notification. The owner of a solar ener•, e 3 em that will physica I ect to a house or other <br /> ' d must a l for a ' :'*. agreement with the <br /> building's electrical system and/or the electric .�_� gri pp y gr <br /> municipal utility prior to the issuance of a building F �+ •t. -, <br /> c) Compliance <br /> 1. Compliance with building codes. All solar s shall c. with the Minnesota Building <br /> Code and any local building code req • nts. <br /> a. Solar hot s shall co ' i�, 'th H elates s ' ements of the Energy <br /> Code. <br /> 2. Compliance with elec All so ro ergy sys a .11 comp th the National Electrical Code. <br /> a. Electric sola gy sys g compon j ust have a UL listing <br /> b. S. s, •of water . ; " e an S rating <br /> 3. Compli�� � <' code.` ar they ste all comply with the Minnesota State Plumbing <br /> p y g <br /> co .. <br /> d) Abandonmen <br /> 1. If the solar e system rem: `•,nonfun...nal or inoperative for more than twelve (12) consecutive <br /> months, the s : x• shall cons e a public nuisance. The property owner shall obtain a demolition <br /> permit and remo aband. system at their expense. Removal includes the entire structure, <br /> including collector, t, . : ansmission equipment. <br /> e) Conditional Uses <br /> 1.Any Community Solar or Solar Farm project shall require a Conditional Use Permit. <br /> 2.Any solar project exceeding 40 kW shall require a Conditional Use Permit. <br /> 3.Any solar project developed over public or semi-public existing infrastructure (i.e. trail,parking lot, <br /> sidewalk,pavilion, etc.) shall require a Conditional Use Permit. <br />