My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1.a.-f. ERMUSR 03-15-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2016
>
03-15-2016
>
6.1.a.-f. ERMUSR 03-15-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2016 10:43:10 AM
Creation date
3/15/2016 10:43:04 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/15/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Eric Volk-Water Superintendent <br /> John Dietz—Chair <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> March 15, 2016 6.1e <br /> SUBJECT: <br /> Staff Update <br /> DISCUSSION: <br /> • Delivered three new residential water meters. <br /> • Sealed the water meter, and took curb stop ties from four water services. <br /> • Went on ten service calls. <br /> • Completed 25 BACTIITota1 Chlorine Residual Samples <br /> o All confirmed negative for Coliform Bacteria. <br /> • Completed 20 routine fluoride samples <br /> o All samples met MDH standards. <br /> • The water operators continued to prepare Well#3 for sandblasting and painting. This was <br /> a very involved process. They had to remove anything that could be damaged by the <br /> sandblasting. The painter is required to be completed by April 1; at that point the water <br /> operators will begin to reinstall all of the equipment inside of the well. We will have EH <br /> Renner reinstall the new vertical line shaft turbine. The well will be up and running in <br /> time for hydrant flushing, scheduled for the second week of May. <br /> • Josh, Phil, and Amy from the Parks Department came in and performed some tree <br /> removal and brush hogging around Well#3. They did an excellent job. Huge thanks to <br /> them. I attached some before and after pictures. <br /> • Nick Adams filled the vacant water operator position. His first day of work was February <br /> 18. <br /> • Dave Ninow attended Minnesota Rural Water Associations' (MRWA)Water& <br /> Wastewater Technical Conference March 1-3 in St. Cloud,MN, and Mike Langer <br /> attended Minnesota Municipal Utilities Associations' (MMUA) First Line Supervision <br /> Program February 24-26 in Plymouth, MN. Their education reports are attached. <br /> ATTACHMENTS: <br /> • February Pumping by Well <br /> • February 2015 Accumulated Precipitation Graph <br /> • February 2015 Daily Temperature Graph <br /> ■— r IVEHFP er <br /> ■tlPage 1 of 2 NATURE <br /> Reliable Public <br /> Power Provider P O W E R E D T o S ERV E <br /> 188 <br />
The URL can be used to link to this page
Your browser does not support the video tag.