Laserfiche WebLink
12, No suit or action shall be commenced by a Claimant under S. The total amount due and unpaid to the <br /> this Bond other than in a court of competent jurisdiction in Claimant for labor, materials, or equipment <br /> the state in which the project that is the subject of the furnished as of the date of the Claim. <br /> Construction Contract is located or after the expiration of <br /> one year from the date(1)on which the Claimant sent a 16.2 Claimant. An individual or entity having a direct <br /> Claim to the Surety pursuant to Paragraph 5.1.2 or 5.2,or contract with the Contractor or with a <br /> (2) on which the last labor or service was performed by subcontractor of the Contractor to furnish labor, <br /> anyone or the last materials or equipment were furnished materials,or equipment for use in the performance <br /> by anyone under the Construction Contract,whichever of of the Construction Contract. The term Claimant <br /> (1) or(2)first occurs_ If the provisions of this paragraph also includes any individual or entity that has <br /> are void or prohibited by law, the minimum period of rightfully asserted a claim under an applicable <br /> limitation available to sureties as a defense in the mechanic's lien or similar statute against the real <br /> jurisdiction of the suit shall be applicable. property upon which the Project is located. The <br /> intent of this Bond shall be to include without <br /> 13. Notice and Claims to the Surety, the Owner, or the limitation In the terms of labor, materials, or <br /> Contractor shall be mailed or delivered to the address equipment" that part of the water, gas, power, <br /> shown on the page on which their signature appears. light, heat, ail, gasoline, telephone service, or <br /> Actual receipt of notice or Claims,however accomplished, rental equipment used in the Construction <br /> shall be sufficient compliance as of the date received. Contract, architectural and engineering services <br /> required for performance of the work of the <br /> 14. When this Bond has been furnished to comply with a Contractor and the Contractor's subcontractors, <br /> statutory or other legal requirement in the location where and all other items for which a mechanic's lien may <br /> the construction was to be performed, any provision in be asserted in the jurisdiction where the labor, <br /> this Bond conflicting with said statutory or legal materials,or equipment were furnished. <br /> requirement shall be deemed deleted herefrom and <br /> provisions conforming to such statutory or other legal 16.3 Construction Contract: The agreement between <br /> requirement shall be deemed incorporated herein. When the Owner and Contractor identified on the cover <br /> so furnished,the intent is that this Bond shall be construed page, including all Contract Documents and all <br /> as a statutory bond and not as a common law bond. changes made to the agreement and the Contract <br /> Documents, <br /> 15. Upon requests by any person or entity appearing to be a <br /> potential beneficiary of this Bond, the Contractor and 16.4 Owner Default: Failure of the Owner, which has <br /> Owner shall promptly furnish a copy of this Bond or shall not been remedied or waived, to pay the <br /> permit a copy to be made. Contractor as required under the Construction <br /> Contract or to perform and complete or comply <br /> 16, Definitions with the other material terms of the Construction <br /> Contract. <br /> 16.1 Claim: A written statement by the Claimant <br /> including at a minimum: 16.5 Contract Documents: AU the documents that <br /> comprise the agreement between the Owner and <br /> 1. The name of the Claimant; Contractor. <br /> 2. The name of the person for whom the labor <br /> was done, or materials or equipment 17. if this Bond is issued for an agreement between a <br /> furnished; contractor and subcontractor,the term Contractor in this <br /> 3. A copy of the agreement or purchase order Band shall be deemed to be Subcontractor and the term <br /> pursuant to which labor, materials, or Owner shall be deemed to be Contractor. <br /> equipment was furnished for use in the <br /> performance of the Construction Contract; 18. Modifications to this Bond are as follows: <br /> 4. A brief description of the labor, materials,or <br /> equipment furnished; <br /> 5. The date on which the Claimant last <br /> performed labor or last furnished materials or <br /> equipment for use in the performance of the <br /> Construction Contract; <br /> 6. The total amount earned by the Claimant for <br /> labor,materials,or equipment furnished as of <br /> the date of the Claim; <br /> 7. The total amount of previous payments <br /> received by the Claimant;and <br /> EICDCe C-615,Payment Bond <br /> Copyright eb 2013 National Society of Professional Engineeas,American Counra of Engineering Companies, <br /> and Anmericen Society of Civil Engineers. All rights reserved. 3 of 3 <br /> 123 <br />