Laserfiche WebLink
Documents,or by any specific provision of the Contract Documents),any Work is found to <br /> be defective,or if the repair of any damages to the Site,adjacent areas that Contractor has <br /> arranged to use through construction easements or otherwise,and other adjacent areas <br /> used by Contractor as permitted by Laws and Regulations, is found to be defective,then <br /> Contractor shall promptly, without cost to Owner and in accordance with Owners written <br /> instructions: <br /> 1. correct the defective repairs to the Site or such other adjacent areas;or <br /> 2. correct such defective Work;or <br /> 3. if the defective Work has been rejected by Owner, remove it from the Project and <br /> replace it with Work that is not defective,and <br /> 4. satisfactorily correct or repair or remove and replace any damage to other Work,to the <br /> work of others or other land or areas resulting therefrom. <br /> Revised per Addendum 3-Supplementary Conditions <br /> ELKMU 134310 00 73 00- <br /> 115 <br />